19.11.2014 Views

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

:ITY Of PRINCE GEORGE<br />

Existing Chlorine<br />

Contact Tank<br />

Initiate UI reduction program and<br />

complete over 5110 year period;<br />

assess PWWF based on results.<br />

0 Decommission exisitng <strong>Blackburn</strong><br />

WWTP and restorellandscape site as<br />

required.<br />

Sludge Storage<br />

I<br />

7 (<br />

T,<br />

Secondary Clarifiers<br />

a Replace lagoon system with new<br />

secondary treatment plant; evaluate<br />

SBR, RBC and extended aeration<br />

process; provide treatment<br />

capability for ammonia reduction to<br />

address toxicity concerns.<br />

No routing of flow to Lansdowne<br />

Road WWTP.<br />

Asses conditionlcapacity of existing<br />

Mackus Road PS.<br />

Anoxic delector<br />

I<br />

,-- Concrete<br />

Ditch<br />

Existing Lagoons<br />

- Existing Operations Building<br />

(clw New Screens, Blowem)<br />

City of Prince George<br />

<strong>Blackburn</strong> <strong>Wastewater</strong> <strong>Treatment</strong> Plan!<br />

<strong>Treatment</strong> Options <strong>Study</strong><br />

ENGINEERING LIMITED<br />

OPTION 7<br />

Figure 4. i

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!