Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
:ITY Of PRINCE GEORGE<br />
Existing Chlorine<br />
Contact Tank<br />
Initiate UI reduction program and<br />
complete over 5110 year period;<br />
assess PWWF based on results.<br />
0 Decommission exisitng <strong>Blackburn</strong><br />
WWTP and restorellandscape site as<br />
required.<br />
Sludge Storage<br />
I<br />
7 (<br />
T,<br />
Secondary Clarifiers<br />
a Replace lagoon system with new<br />
secondary treatment plant; evaluate<br />
SBR, RBC and extended aeration<br />
process; provide treatment<br />
capability for ammonia reduction to<br />
address toxicity concerns.<br />
No routing of flow to Lansdowne<br />
Road WWTP.<br />
Asses conditionlcapacity of existing<br />
Mackus Road PS.<br />
Anoxic delector<br />
I<br />
,-- Concrete<br />
Ditch<br />
Existing Lagoons<br />
- Existing Operations Building<br />
(clw New Screens, Blowem)<br />
City of Prince George<br />
<strong>Blackburn</strong> <strong>Wastewater</strong> <strong>Treatment</strong> Plan!<br />
<strong>Treatment</strong> Options <strong>Study</strong><br />
ENGINEERING LIMITED<br />
OPTION 7<br />
Figure 4. i