Section 4.0 - Blackbum <strong>Treatment</strong> Ovtions<br />

Diameter, mrn 300<br />

Length, m 100<br />

Gravity sewer along l5Ih ~ ve. from Taylor Drive to Birch Street;<br />

connect to 525 diameter sewer<br />

Diameter, mm 300<br />

Length, m 180<br />

Pumpstation<br />

<strong>Upgrade</strong> Mackus Road PS for PWWF capacity<br />

Supply and install PS at existing Blackbum WWTP site to<br />

senice residence along Graves and Foreman Roads; capable of<br />

pumping 10 percent of PWWF.<br />

Miscellaneous<br />

Restordlandscape existing Blackbum WWTP site.<br />

4.1.3 Cost Estimate<br />

Pipework<br />

1 5 0 forcemain, S 1 00/m<br />

200 forcernain, $1 8O/m<br />

200 syphon, $200/m<br />

300 gravity sewer<br />

<strong>Blackburn</strong>, $1 60/m<br />

Downtown, $250/m<br />

Pumpstation<br />

Mach Road PS, LS<br />

Foreman Road PS, LS<br />

Miscellaneous<br />

Blackbum WWTP site restoration/lmdscaping, LS<br />

Subtotal<br />

Contingencies (15 percent)<br />

EngineeringIAdministration (20 percent)<br />

GST (3 percent)<br />

TOTAL<br />

4.2 OPTION 2 - DECOMMISSION EXISTING BLACKBURN WVTP AND<br />

ROUTE ALL FLOW TO LANSDOWNE ROAD WWTP VIA GRAVITY<br />

SEWER CONNECTION<br />

4.2.1 Outline<br />

In this option the existing sewage lagoons would be decommissioned and all<br />

flow transferred for treatment at the Lansdowne Road WWTP via a new trunk<br />

gravity sewer. A schematic representation of this option is presented in Figure