19.11.2014 Views

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 5.0 -Evaluation of Options<br />

part, be addressed by adding the weighting factors to the results and by using<br />

the following approach in parallel.<br />

5.3 EVALUATION RESULTS<br />

Attached as Appendix C and D are the results of the October 19, 1999<br />

Decision Workshop. Attending this workshop were the following individuals:<br />

City of Prince George<br />

Gary Champagne<br />

Andy Zbul<br />

DaveDyer<br />

Frank Blues<br />

Norm Gobbi<br />

MOELP<br />

Ritch Girard<br />

L&M Engineering<br />

Reid Crowther<br />

Bany Rabinowitz<br />

LesNemeth<br />

Andy North<br />

Form 5.1 was completed by each member of the Decision Workshop. A<br />

weighting number for cost, technical, operational and mvironmentaVaesthetic<br />

factors was developed based on the averaged group scores. Cost was weighted<br />

highest followed by operational and technical criteria, with environmental and<br />

aesthetic criteria weighted lowest. Form 5.2 was similarly developed from<br />

individual scores to weight the individual evaluation criteria.<br />

Form 5.3 lists the ranking of each of the options 1 to 7 based on the weighting<br />

numbers developed in Form 5.2. The ranking results for the options indicates<br />

that Option 1 (score 268) and Option 2 (score 286) are the most favoured<br />

options, options 3 to 6 score similarly (in the range 227 to 238), and the least<br />

favoured option is Option 7 (score 175).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!