Section 5.0 -Evaluation of Options<br />
part, be addressed by adding the weighting factors to the results and by using<br />
the following approach in parallel.<br />
5.3 EVALUATION RESULTS<br />
Attached as Appendix C and D are the results of the October 19, 1999<br />
Decision Workshop. Attending this workshop were the following individuals:<br />
City of Prince George<br />
Gary Champagne<br />
Andy Zbul<br />
DaveDyer<br />
Frank Blues<br />
Norm Gobbi<br />
MOELP<br />
Ritch Girard<br />
L&M Engineering<br />
Reid Crowther<br />
Bany Rabinowitz<br />
LesNemeth<br />
Andy North<br />
Form 5.1 was completed by each member of the Decision Workshop. A<br />
weighting number for cost, technical, operational and mvironmentaVaesthetic<br />
factors was developed based on the averaged group scores. Cost was weighted<br />
highest followed by operational and technical criteria, with environmental and<br />
aesthetic criteria weighted lowest. Form 5.2 was similarly developed from<br />
individual scores to weight the individual evaluation criteria.<br />
Form 5.3 lists the ranking of each of the options 1 to 7 based on the weighting<br />
numbers developed in Form 5.2. The ranking results for the options indicates<br />
that Option 1 (score 268) and Option 2 (score 286) are the most favoured<br />
options, options 3 to 6 score similarly (in the range 227 to 238), and the least<br />
favoured option is Option 7 (score 175).