Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1<br />
Initiate In reduction program and<br />
complete over 5/10 years;<br />
assess PWWF based on results.<br />
0 Decommission existing <strong>Blackburn</strong><br />
WWTP and restorellandscape site.<br />
a Route all flow to Lansdowne Road<br />
Pipeline route (8 8 rn 8) from Mackus<br />
Road PS to Correctional Centre tie-in.<br />
Pipeline route (8 8 rn .)from new PS at<br />
decommissioned <strong>Blackburn</strong> WWTP<br />
site to Mackus Road PS.<br />
a Assess conditionlcapacity of existing<br />
Mackus Road PS.<br />
downtown area.<br />
Assess impact of added sewage flow<br />
on Lansdowne Road WWTP<br />
capacityloperation.<br />
Exist. Sanitary Collection Mains<br />
Blackbum Sanitary Collection Area<br />
City of Prince George<br />
ckburn <strong>Wastewater</strong> <strong>Treatment</strong> <strong>Plant</strong><br />
<strong>Treatment</strong> Options <strong>Study</strong><br />
I