19.11.2014 Views

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1<br />

Initiate In reduction program and<br />

complete over 5/10 years;<br />

assess PWWF based on results.<br />

0 Decommission existing <strong>Blackburn</strong><br />

WWTP and restorellandscape site.<br />

a Route all flow to Lansdowne Road<br />

Pipeline route (8 8 rn 8) from Mackus<br />

Road PS to Correctional Centre tie-in.<br />

Pipeline route (8 8 rn .)from new PS at<br />

decommissioned <strong>Blackburn</strong> WWTP<br />

site to Mackus Road PS.<br />

a Assess conditionlcapacity of existing<br />

Mackus Road PS.<br />

downtown area.<br />

Assess impact of added sewage flow<br />

on Lansdowne Road WWTP<br />

capacityloperation.<br />

Exist. Sanitary Collection Mains<br />

Blackbum Sanitary Collection Area<br />

City of Prince George<br />

ckburn <strong>Wastewater</strong> <strong>Treatment</strong> <strong>Plant</strong><br />

<strong>Treatment</strong> Options <strong>Study</strong><br />

I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!