Section 4.0 - Blackbum <strong>Treatment</strong> Options<br />
HRT (@ ADWF = 1,750 m3/d), d<br />
Lagoon 2N2B (secondary)<br />
Number<br />
Volume, rn3<br />
HRT (@ ADWF = 1,750 m3/d), d<br />
0 Aeration Blowers<br />
Number<br />
Power, hp<br />
Headworks<br />
According to original design data presented on AESL as-built drawing 4102-<br />
01-S-102, the influent works (channels and screens) are adequately sized to<br />
accommodate Stage 2 flows. No major modifications are required in this area.<br />
Aerated Lagoons<br />
The aerated lagoon system will need to be twinned to accommodate the design<br />
ADWF of 1,750 m3/d. Construction work involves the following:<br />
Excavation of two lagoons to the east of the existing two. The dimensions<br />
will be identical to the existing lagoons. The total volume to be excavated<br />
is approximately 23,000 m3. It is assumed some of the excavated material<br />
can be used to extend the berm and no material needs to be imported to<br />
complete construction.<br />
Replacement of both existing 60 hp aeration blowers. Depending on the<br />
mode of operation, the plant presently requires either 1 or both blowers<br />
running; series operation requires 60 hp, and parallel requires 120 hp. Stage<br />
2 requires 150 hp for series and 225 hp for parallel. There is presently<br />
room for three blowers in the existing building. Assuming present<br />
operating practice of no standby capacity during parallel operation is<br />
maintained, three 75 hp (nominal) aeration blowers will be required.<br />
Duplication of the air distribution system (34 "aeration guns" in each<br />
lagoon for a total of 68 new units). If is assumed the air distribution<br />
pipework will be mirrored.<br />
Additional emuent and drain piping will be required to connect the new<br />
lagoons to the chlorine contact chamber. The chlorine contact chamber is<br />
adequate for Stage 2 flows. It is assumed the new emuent pipework will be<br />
of similar configuration to the existing, with approximately 350 m of 300<br />
mm pipe, 2 manholes, and 3 concrete chambers.