Section 4.0 - Blackbum <strong>Treatment</strong> Options<br />

HRT (@ ADWF = 1,750 m3/d), d<br />

Lagoon 2N2B (secondary)<br />

Number<br />

Volume, rn3<br />

HRT (@ ADWF = 1,750 m3/d), d<br />

0 Aeration Blowers<br />

Number<br />

Power, hp<br />

Headworks<br />

According to original design data presented on AESL as-built drawing 4102-<br />

01-S-102, the influent works (channels and screens) are adequately sized to<br />

accommodate Stage 2 flows. No major modifications are required in this area.<br />

Aerated Lagoons<br />

The aerated lagoon system will need to be twinned to accommodate the design<br />

ADWF of 1,750 m3/d. Construction work involves the following:<br />

Excavation of two lagoons to the east of the existing two. The dimensions<br />

will be identical to the existing lagoons. The total volume to be excavated<br />

is approximately 23,000 m3. It is assumed some of the excavated material<br />

can be used to extend the berm and no material needs to be imported to<br />

complete construction.<br />

Replacement of both existing 60 hp aeration blowers. Depending on the<br />

mode of operation, the plant presently requires either 1 or both blowers<br />

running; series operation requires 60 hp, and parallel requires 120 hp. Stage<br />

2 requires 150 hp for series and 225 hp for parallel. There is presently<br />

room for three blowers in the existing building. Assuming present<br />

operating practice of no standby capacity during parallel operation is<br />

maintained, three 75 hp (nominal) aeration blowers will be required.<br />

Duplication of the air distribution system (34 "aeration guns" in each<br />

lagoon for a total of 68 new units). If is assumed the air distribution<br />

pipework will be mirrored.<br />

Additional emuent and drain piping will be required to connect the new<br />

lagoons to the chlorine contact chamber. The chlorine contact chamber is<br />

adequate for Stage 2 flows. It is assumed the new emuent pipework will be<br />

of similar configuration to the existing, with approximately 350 m of 300<br />

mm pipe, 2 manholes, and 3 concrete chambers.