19.11.2014 Views

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 4.0 - Blackbum <strong>Treatment</strong> Options<br />

Extended Aeration <strong>Plant</strong><br />

Sitework<br />

Excavation, preparation, backfill, etc., LS<br />

Structural<br />

Headworks/blower bldg./sludge vault, LS<br />

Bioreactor, LS<br />

Clarifiers, LS<br />

Equipment<br />

Headworkshlower bldg.lsludge vault, LS<br />

Bioreactor, LS<br />

Clarifiers, LS<br />

Mechanical<br />

Headworkslblower bldg.ls1udge vault, LS<br />

Bioreactor, LS<br />

Clarifiers,LS<br />

ElectricallInstrumentation<br />

Headworkdblower bldg./sludge vault, LS<br />

Bioreactor, LS<br />

Clarifiers, LS<br />

MisceUaneous, LS<br />

Pumpstation<br />

Makus Road PS, LS<br />

Subtotal<br />

Contingencies (15 percent)<br />

EngineeringtAdministration (20 percent)<br />

GST (3 percent)<br />

Total<br />

When compared to the conventional activated sludge option, the incorporation<br />

of nitrification into the process design increases the capital cost of this option<br />

by over $0.5 M, or approximately 35 percent.<br />

4.8 LIFE CYCLE COST ANALYSIS<br />

Seven basic options were identified in the previous sections as being<br />

appropriate for evaluation. Two of the options, Options 6 and 7, are based on<br />

maintaining full secondary treatment at the Blackbum WWTP site. These two<br />

options have been further subdivided into Options 6a and 6b, and 7a and 7b,<br />

respectively, to address the issue of ammonia toxicity removal. Conceptual<br />

level costing has been developed for each of the options as well as detailed

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!