Section 5.0 - Evahation of Options<br />

FORM 5.2<br />

Specific Weighting of the Decision Criteria<br />

to be Used in the Evaluation<br />

Cost Criteria (Max = 10)<br />

Ca~ital Cost<br />

Life-Cycle Cost<br />

Technical Criteria I (Max. = 10)<br />

ReliabilityRobustness<br />

Flexibility I complexity /<br />

Sophistication<br />

Ease of Construction j~and<br />

Requirements<br />

I<br />

I<br />

Operational Criteria (Max. = 10)<br />

Ease of Operation and<br />

Maintenance<br />

Safety<br />

Staffing<br />

Environmental and Aesthetic Criteria I (Max. = 10)<br />

Effect on Surrounding Area I I<br />

Visual / Noise I Traffic