Section 5.0 - Evahation of Options<br />
FORM 5.2<br />
Specific Weighting of the Decision Criteria<br />
to be Used in the Evaluation<br />
Cost Criteria (Max = 10)<br />
Ca~ital Cost<br />
Life-Cycle Cost<br />
Technical Criteria I (Max. = 10)<br />
ReliabilityRobustness<br />
Flexibility I complexity /<br />
Sophistication<br />
Ease of Construction j~and<br />
Requirements<br />
I<br />
I<br />
Operational Criteria (Max. = 10)<br />
Ease of Operation and<br />
Maintenance<br />
Safety<br />
Staffing<br />
Environmental and Aesthetic Criteria I (Max. = 10)<br />
Effect on Surrounding Area I I<br />
Visual / Noise I Traffic