SECTION 1.0<br />

STUDY BACKGROUND AND OBJECTIVES<br />

1.1 INTRODUCTION<br />

Integral to the continued growth and development of the City of Prince George is a<br />

reliable sewage collection and treatment system that meets current environmental<br />

standards. Over the years, steady development has taken place in the city central areas<br />

and the Nechako area to the north of the city core. Within the <strong>Blackburn</strong> area, which<br />

is located east of the Fraser River in the east sector of the City, development has been<br />

curtailed due to limited water supply to this area. In addition to the water supply<br />

system, irhastructure is in place for sewage collection and treatment. The City of<br />

Prince George is serviced primarily by one main wastewater treatment facility located<br />

on Lansdowne Road. Outlying subdivisions or sewage collection areas such as the<br />

Blackbum area are serviced by small satellite wastewater treatment facilities.<br />

Until recently, there has been a development moratorium in place in the Blackbum<br />

area due to inadequate water supply. The water supply system has now been upgraded<br />

and the moratorium lifted. It is anticipated that the Blackbum area will experience a<br />

healthy population growth rate and the planned population horizon of 5,000 could be<br />

realized in the next 25 years.<br />

With the anticipated growth and development in the Blackbum area, the City now<br />

wishes to consider the most appropriate and economic option for wastewater<br />

collection/treatment, as well as being in compliance with the new Municipal Sewage<br />

Regulations. The issues that drive the evaluation of options are the capacity of the<br />

existing treatment facility to meet effluent quality criteria; and, the high inflow and<br />

infiltration @'I) peak flows into the collection system that impart hydraulic limitations<br />

both at the Mackus Road pumpstation and at the treatment facility. .<br />

Further to the issues related to the existing sewage collection and treatment system and<br />

the anticipated population growth projections for the Blackbum area, the City of<br />

Prince George commissioned Reid Crowther and Partners Ltd. in September 1999, to<br />

prepare a study to evaluate options on how to manage sewage collected within the<br />

<strong>Blackburn</strong> sewerage area. This report presents these f ndings; identifies and evaluates<br />

options using both economic and non-economic criteria; and recommends an<br />

implementation plan.