19.11.2014 Views

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CITY OF PRINCE GEORGE<br />

Scale= $:I00<br />

f<br />

Existing Chlorine<br />

Contact Tank<br />

Initiate Ill reduction program and<br />

complete over 5/10 year period;<br />

assess PWWF based on results.<br />

0 <strong>Upgrade</strong> and expand Blackbum<br />

WWTP lagoon facility; provide<br />

treatment capability for ammonia<br />

reduction to address toxicity concerns.<br />

No routing of flow to Lansdowne Road<br />

WWT P.<br />

Assess conditionlcapacity of existing<br />

Mackus Road PS.<br />

Existing<br />

Operations<br />

Building<br />

lsM<br />

ENGINEERING LIMITED<br />

City of Prince George<br />

<strong>Blackburn</strong> <strong>Wastewater</strong> <strong>Treatment</strong> Planl<br />

<strong>Treatment</strong> Options <strong>Study</strong><br />

OPTION 6<br />

Figure 4. t

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!