Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CITY OF PRINCE GEORGE<br />
Scale= $:I00<br />
f<br />
Existing Chlorine<br />
Contact Tank<br />
Initiate Ill reduction program and<br />
complete over 5/10 year period;<br />
assess PWWF based on results.<br />
0 <strong>Upgrade</strong> and expand Blackbum<br />
WWTP lagoon facility; provide<br />
treatment capability for ammonia<br />
reduction to address toxicity concerns.<br />
No routing of flow to Lansdowne Road<br />
WWT P.<br />
Assess conditionlcapacity of existing<br />
Mackus Road PS.<br />
Existing<br />
Operations<br />
Building<br />
lsM<br />
ENGINEERING LIMITED<br />
City of Prince George<br />
<strong>Blackburn</strong> <strong>Wastewater</strong> <strong>Treatment</strong> Planl<br />
<strong>Treatment</strong> Options <strong>Study</strong><br />
OPTION 6<br />
Figure 4. t