Section 4.0 - <strong>Blackburn</strong> <strong>Treatment</strong> Options<br />
Miscellaneous<br />
<strong>Blackburn</strong> WWTP modifications to allow lagoons<br />
to operate as storage basins, LS 100,000<br />
Subtotal 1,165,000<br />
Contingencies (15 percent) 175,000<br />
EngineerindAdministration (20 percent) 235,000<br />
GST (3 percent) 35,000<br />
TOTAL 1,610,000<br />
4.4 OPTION 4 - TRANSFER ALL FLOW < 2*ADWF TO LANSDOWNE<br />
ROAD WWTP AND USE THE EXISTING BLACKBURN WWTP TO<br />
TREAT FLOWS > 2*ADWF<br />
4.4.1 Outline<br />
In this option all flows up to 2*ADW would be transferred &om the<br />
Blackbum sewage collection area for treatment at the Lansdowne Road<br />
WWTP. The existing sewage lagoons would be used only to treat wet weather<br />
flows > 2*ADWF. A schematic representation of this option is presented in<br />
Figure 4.4. An yI reduction program is to be initiated and completed to reduce<br />
the volume of wastewater being treated in the lagoons during wet weather and<br />
snowmelt conditions. The existing Mackus Road pumpstation would be<br />
upgraded and a new pumpstation constructed to handle excess flow<br />
>2*ADWF. It is believed that the Lansdowne Road WWTP has sufficient<br />
capacity to handle the projected future 2*ADWF hydraulic and BODnSS<br />
loadings f7om the <strong>Blackburn</strong> sewage collection area. All wet weather flow ><br />
2*ADWF will be pumped to the existing Blackbum WWTP for treatment.<br />
Key activities or capital works associated with this option are as follows:<br />
Implement III reduction program.<br />
<strong>Upgrade</strong> Mackus Road pumpstation to handle projected increased flows.<br />
Ail dry weather flows < 2*ADWF are to be pumped to Lansdowne Road<br />
WWTP; all wet weather flows > 2*ADWF are to be pumped to <strong>Blackburn</strong><br />
WWTP.<br />
Construct trunk gravity sewer and/or forcemain to transfer all flows<br />