Section 4.0 - <strong>Blackburn</strong> <strong>Treatment</strong> Options<br />

Pipework<br />

Gravity sewermain from the existing Blackbum WWTP site to<br />

the Regional Correctional Centre tie-in<br />

Diameter, mm<br />

Length, m<br />

Sanitary sewer syphon from Yellowhead Bridge connecting to<br />

downtown sewage collection system<br />

Diameter, mm<br />

Length, m<br />

Gravity sewer to intersection of l5Ih Ave. and Taylor Drive;<br />

construct new manhole<br />

Diameter, mm<br />

Length, m<br />

Gravity sewer along 15" Ave. from Taylor Drive to Birch St.;<br />

connect to 525 diameter sewer<br />

Diameter, mm<br />

Length, m<br />

Pumpstation<br />

<strong>Upgrade</strong> Mackus Road PS for PWWF capacity<br />

Miellaneous<br />

Restoreflandscape existing <strong>Blackburn</strong> WWTP site.<br />

4.23 Cost Estimate<br />

Pipework<br />

200 syphon, $200/m<br />

300 gravity sewer<br />

<strong>Blackburn</strong>, $160/m<br />

Downtown, $250/m<br />

Pumpstation<br />

Mackus Road PS, LS<br />

Miscellaneous<br />

Btackburn M P site restoratiodandscaping, LS<br />

Subtotal<br />

Contingencies (15 percent)<br />

EngineerindAdministration (20 percent)<br />

GST (3 percent)<br />

TOTAL