Section 4.0 - Blackbum <strong>Treatment</strong> Options<br />

Pipework<br />

Gravity sewermain fiom the existing <strong>Blackburn</strong> WWTP site to<br />

the Regional Correctional Centre tie-in<br />

Diameter, mm<br />

Length, m<br />

Sanitary sewer syphon from Yellowhead Bridge connecting to<br />

downtown sewage collection system<br />

Diameter, mm<br />

m<br />

Gravity sewer to intersection of 1 5 Ave. ~ ~ and Taylor Drive;<br />

construct new manhole<br />

Diameter, mm<br />

Length, m<br />

Gravity sewer along 15Ih Ave. from Taylor Drive to Birch St.;<br />

connect to 525 diameter s&er<br />

Diameter, mm<br />

ten&, m<br />

Pumpstation<br />

<strong>Upgrade</strong> Mackus Road PS for P WWF capacity<br />

Miscellaneous<br />

Restore/landscape existing Blackbum WWTP site.<br />

4.2.3 Cost Estimate<br />

Pipework<br />

200 syphon, $200/m<br />

300 gravity sewer<br />

Blackbum, $160/m<br />

Downtown, $250/m<br />

Pumpstation<br />

Mach Road PS, LS<br />

Miscellaneous<br />

<strong>Blackburn</strong> WWTP site restorationtlandscaping, LS<br />

Subtotal<br />

Contingencies (1 5 percent)<br />

Engineering/Adrninistration (20 percent)<br />

GST (3 percent)<br />

TOTAL