Section 4.0 - Blackbum <strong>Treatment</strong> Options<br />
Pipework<br />
Gravity sewermain fiom the existing <strong>Blackburn</strong> WWTP site to<br />
the Regional Correctional Centre tie-in<br />
Diameter, mm<br />
Length, m<br />
Sanitary sewer syphon from Yellowhead Bridge connecting to<br />
downtown sewage collection system<br />
Diameter, mm<br />
m<br />
Gravity sewer to intersection of 1 5 Ave. ~ ~ and Taylor Drive;<br />
construct new manhole<br />
Diameter, mm<br />
Length, m<br />
Gravity sewer along 15Ih Ave. from Taylor Drive to Birch St.;<br />
connect to 525 diameter s&er<br />
Diameter, mm<br />
ten&, m<br />
Pumpstation<br />
<strong>Upgrade</strong> Mackus Road PS for P WWF capacity<br />
Miscellaneous<br />
Restore/landscape existing Blackbum WWTP site.<br />
4.2.3 Cost Estimate<br />
Pipework<br />
200 syphon, $200/m<br />
300 gravity sewer<br />
Blackbum, $160/m<br />
Downtown, $250/m<br />
Pumpstation<br />
Mach Road PS, LS<br />
Miscellaneous<br />
<strong>Blackburn</strong> WWTP site restorationtlandscaping, LS<br />
Subtotal<br />
Contingencies (1 5 percent)<br />
Engineering/Adrninistration (20 percent)<br />
GST (3 percent)<br />
TOTAL