'IN - OF PRINCE GEORGE<br />
I<br />
Initiate Ill reduction program and<br />
complete over 5/10 year period;<br />
assess PWWF based on results.<br />
Decommission existing <strong>Blackburn</strong><br />
WWTP and restorellandscape site.<br />
a Route all flow to Lansdowne Road<br />
WWT P.<br />
Pipeline route (m m m) from Blackbum<br />
WWTP site to Correctional Centre tie-in.<br />
Assess conditionlcapacity of existing<br />
Mackus Road PS.<br />
a Assess conditionlcapacity of existing<br />
sewage conveyance system through<br />
downtown area.<br />
. . . . . - -<br />
~rin ~...<br />
, - ..c4 a Assess impact of added sewage flow<br />
citydf" .<br />
cg~- ~ed@e<br />
: / Road<br />
L ---- - . .<br />
on Lansdowne Road WWTP<br />
capacityloperation.<br />
.- ~<br />
..-. - --~<br />
LEGEND:<br />
------ Exist. Sanitary Collection Mains<br />
<strong>Blackburn</strong> Sanitary Collection Area<br />
City of Prince George<br />
ckburn <strong>Wastewater</strong> <strong>Treatment</strong> <strong>Plant</strong><br />
<strong>Treatment</strong> Options <strong>Study</strong><br />
OPTION 2<br />
ENGINEERING LIMITE; Figure 4.2<br />