Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Blackburn Wastewater Treatment Plant Upgrade Study
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Initiate I11 reduction program and<br />
complete over 5110 year period;<br />
assess PWWF based on results.<br />
Decommission existing Blackbum<br />
WWTP and restorellandscape site.<br />
Route all flow to Lansdowne Road<br />
WWTP.<br />
Pipeline route (a m rn a) from Blackbum<br />
WWTP site to Correctional Centre tie41<br />
Assess conditionlcapacity of existing<br />
Mackus Road PS.<br />
Assess conditionlcapaciiy of existing<br />
sewage conveyance system through<br />
downtown area.<br />
Assess impact of added sewage flow<br />
on Lansdowne Road WWTP<br />
capacityloperation.<br />
LEGEND:<br />
Exist. Sanitary Collection Mains<br />
Blackbum Sanitary Collection Area<br />
City of Prince George<br />
<strong>Blackburn</strong> <strong>Wastewater</strong> <strong>Treatment</strong> <strong>Plant</strong><br />
<strong>Treatment</strong> Options <strong>Study</strong><br />
OPTION 2<br />
Figure 4.2