19.11.2014 Views

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

Blackburn Wastewater Treatment Plant Upgrade Study

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Initiate I11 reduction program and<br />

complete over 5110 year period;<br />

assess PWWF based on results.<br />

Decommission existing Blackbum<br />

WWTP and restorellandscape site.<br />

Route all flow to Lansdowne Road<br />

WWTP.<br />

Pipeline route (a m rn a) from Blackbum<br />

WWTP site to Correctional Centre tie41<br />

Assess conditionlcapacity of existing<br />

Mackus Road PS.<br />

Assess conditionlcapaciiy of existing<br />

sewage conveyance system through<br />

downtown area.<br />

Assess impact of added sewage flow<br />

on Lansdowne Road WWTP<br />

capacityloperation.<br />

LEGEND:<br />

Exist. Sanitary Collection Mains<br />

Blackbum Sanitary Collection Area<br />

City of Prince George<br />

<strong>Blackburn</strong> <strong>Wastewater</strong> <strong>Treatment</strong> <strong>Plant</strong><br />

<strong>Treatment</strong> Options <strong>Study</strong><br />

OPTION 2<br />

Figure 4.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!