E-1. Pre-IOC and FOC (continued)<br />
Support Equipment (SE)<br />
• Have required common and peculiar SE, their calibration requirements and<br />
procedures, and necessary TMDE and tools been identified in the LCMP<br />
• Has availability and adequacy of SE and tools for O- and I-level repair at operational<br />
sites and training schools been verified<br />
• Does the SE deployment strategy support the system beddown schedule for IOC and<br />
FOC<br />
• Has an SE support strategy been developed and implemented<br />
• Have SE training classes been developed and do they support the beddown schedule<br />
• What is the depot support concept for the SE<br />
• Have Allowance Standards of the pre-IOC/FOC checklist been updated to reflect all<br />
SE requirements<br />
• Does the schedule for deployment of Automatic Test Equipment (ATE) to user sites<br />
support the system beddown strategy<br />
• Have installation control drawings for ATE been delivered<br />
• Have calibration requirements for ATE been determined and documented<br />
• Have CM responsibilities for ATE been assigned and are processes implemented<br />
• Are all required Test Program Sets (TPS) complete<br />
• Have the TPSs and associated documentation been evaluated and verified<br />
• Will TPSs required for O- and I-level repair be available at IOC/FOC<br />
• Are plans to duplicate and deploy verified TPSs in place and on schedule<br />
• Has an AF activity (e.g., software support activity) been designated to maintain the<br />
diagnostic software, issue field changes, etc.<br />
• If planned, is the transition to organic support on schedule<br />
Supportability<br />
Computer Resources Support<br />
• Will the software support activity have all software support established (budget,<br />
personnel, tools, facilities, hardware, documentation and support equipment) before<br />
IOC<br />
Supportability Analysis<br />
• Is post-production support planning on schedule<br />
• Is there a plan for a sustained maintenance planning IPT to review the established<br />
maintenance support structure<br />
• Is the sustained maintenance planning IPT functional, including data collection and<br />
analysis funded<br />
• Have support issues been identified<br />
• Have potential solutions been identified and implemented to support the beddown<br />
plan<br />
• Are logistics reviews planned during the deployment phase to assess and address<br />
supportability issues<br />
Version 1: Jan 2006 102<br />
Air Force Independent Logistics Assessment <strong>Handbook</strong>