E-1. Pre-IOC and FOC (continued)<br />

Support Equipment (SE)<br />

• Have required common and peculiar SE, their calibration requirements and<br />

procedures, and necessary TMDE and tools been identified in the LCMP<br />

• Has availability and adequacy of SE and tools for O- and I-level repair at operational<br />

sites and training schools been verified<br />

• Does the SE deployment strategy support the system beddown schedule for IOC and<br />

FOC<br />

• Has an SE support strategy been developed and implemented<br />

• Have SE training classes been developed and do they support the beddown schedule<br />

• What is the depot support concept for the SE<br />

• Have Allowance Standards of the pre-IOC/FOC checklist been updated to reflect all<br />

SE requirements<br />

• Does the schedule for deployment of Automatic Test Equipment (ATE) to user sites<br />

support the system beddown strategy<br />

• Have installation control drawings for ATE been delivered<br />

• Have calibration requirements for ATE been determined and documented<br />

• Have CM responsibilities for ATE been assigned and are processes implemented<br />

• Are all required Test Program Sets (TPS) complete<br />

• Have the TPSs and associated documentation been evaluated and verified<br />

• Will TPSs required for O- and I-level repair be available at IOC/FOC<br />

• Are plans to duplicate and deploy verified TPSs in place and on schedule<br />

• Has an AF activity (e.g., software support activity) been designated to maintain the<br />

diagnostic software, issue field changes, etc.<br />

• If planned, is the transition to organic support on schedule<br />

Supportability<br />

Computer Resources Support<br />

• Will the software support activity have all software support established (budget,<br />

personnel, tools, facilities, hardware, documentation and support equipment) before<br />

IOC<br />

Supportability Analysis<br />

• Is post-production support planning on schedule<br />

• Is there a plan for a sustained maintenance planning IPT to review the established<br />

maintenance support structure<br />

• Is the sustained maintenance planning IPT functional, including data collection and<br />

analysis funded<br />

• Have support issues been identified<br />

• Have potential solutions been identified and implemented to support the beddown<br />

plan<br />

• Are logistics reviews planned during the deployment phase to assess and address<br />

supportability issues<br />

Version 1: Jan 2006 102<br />

Air Force Independent Logistics Assessment <strong>Handbook</strong>