07.01.2015 Views

USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...

USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...

USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

E-1. Pre-IOC and FOC (continued)<br />

• Are plans in place or implemented to assess supportability (identify deviations<br />

between predicted and actual supportability values, identify the causes and propose<br />

remedies)<br />

• Is the supportability analysis database available to the maintaining activity<br />

• How will the results of post-deployment reviews and sustained maintenance planning<br />

be reflected in the maintenance data documentation<br />

Systems Engineering<br />

Reliability, Availability and Maintainability (RAM)<br />

• Is the process implemented to assess achieved RAM performance by collection and<br />

analysis of user data<br />

• Are system thresholds for RAM being achieved in the fleet<br />

• Does equipment maintenance data indicate that uncorrected logistics problems exist<br />

• What are the POA&M for corrective actions<br />

Human Factors Engineering (HFE)<br />

• Have HFE deficiencies identified during previous <strong>ILA</strong>s or testing been corrected<br />

• Have HFE requirements been identified as candidates for engineering change<br />

proposals<br />

• Have contractual provisions been made to allow for adequate HFE simulations using<br />

mockups, models or computer simulations for engineering change proposals<br />

Environment, Safety, and Occupational Health (ESOH)<br />

• What ESOH issues remain open<br />

o Has the Program Office provided the operators, maintainers, testers, and<br />

trainers the ESOH hazard tracking data according to AFI 90-901<br />

o What ESOH hazards have not been eliminated and the residual risks not<br />

accepted at the appropriate management level<br />

o What residual ESOH risks remain in the high or medium risk categories<br />

o Have all the NEPA or EO 12114 documentation requirements identified in the<br />

NEPA Compliance Schedule as being required prior to IOC or FOC been<br />

completed<br />

Version 1: Jan 2006 103<br />

Air Force Independent Logistics Assessment <strong>Handbook</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!