USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
E-1. Pre-IOC and FOC (continued)<br />
• Are plans in place or implemented to assess supportability (identify deviations<br />
between predicted and actual supportability values, identify the causes and propose<br />
remedies)<br />
• Is the supportability analysis database available to the maintaining activity<br />
• How will the results of post-deployment reviews and sustained maintenance planning<br />
be reflected in the maintenance data documentation<br />
Systems Engineering<br />
Reliability, Availability and Maintainability (RAM)<br />
• Is the process implemented to assess achieved RAM performance by collection and<br />
analysis of user data<br />
• Are system thresholds for RAM being achieved in the fleet<br />
• Does equipment maintenance data indicate that uncorrected logistics problems exist<br />
• What are the POA&M for corrective actions<br />
Human Factors Engineering (HFE)<br />
• Have HFE deficiencies identified during previous <strong>ILA</strong>s or testing been corrected<br />
• Have HFE requirements been identified as candidates for engineering change<br />
proposals<br />
• Have contractual provisions been made to allow for adequate HFE simulations using<br />
mockups, models or computer simulations for engineering change proposals<br />
Environment, Safety, and Occupational Health (ESOH)<br />
• What ESOH issues remain open<br />
o Has the Program Office provided the operators, maintainers, testers, and<br />
trainers the ESOH hazard tracking data according to AFI 90-901<br />
o What ESOH hazards have not been eliminated and the residual risks not<br />
accepted at the appropriate management level<br />
o What residual ESOH risks remain in the high or medium risk categories<br />
o Have all the NEPA or EO 12114 documentation requirements identified in the<br />
NEPA Compliance Schedule as being required prior to IOC or FOC been<br />
completed<br />
Version 1: Jan 2006 103<br />
Air Force Independent Logistics Assessment <strong>Handbook</strong>