07.01.2015 Views

USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...

USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...

USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

C-2. Milestone C Documentation (continued)<br />

Typical Document<br />

Request<br />

Reliability,<br />

Availability,<br />

Maintainability and<br />

Supportability<br />

(RAMS) Rationale<br />

Results of Design<br />

Analyses<br />

Site Activation Task<br />

Force (SATAF) or<br />

Program Plans<br />

Software<br />

Development Plan<br />

Software Security<br />

Plan<br />

Description<br />

Report provides plans to influence the design,<br />

and provides reports from the results of the<br />

completed analyses (e.g., FMECA).<br />

Provides analyses as part of the design process<br />

to identify, quantify and qualify product<br />

characteristics in terms of attributes, tolerances<br />

and test-and-inspection requirements necessary<br />

to produce a quality product that meets its lifecycle<br />

and supportability requirements.<br />

Examples of analyses include reliability,<br />

availability and maintainability predictions,<br />

task-time analyses, testability analysis, worstcase<br />

tolerance analysis, stress analysis, sneak<br />

circuit analysis and FMECA.<br />

Site surveys and/or programming plans to<br />

identify facility needs at specified test, training,<br />

depot, operational deployment, and enroute<br />

locations. Review facilities portions of the<br />

system contract, statement of work, program<br />

management plan, data items, and other system<br />

program documentation that identifies facility<br />

requirements and strategies for operational<br />

deployment of the system.<br />

Describes responsibilities, tasks, deliverables<br />

and schedules. The descriptions include how the<br />

design, review and tests will be performed. The<br />

plan addresses management and control of the<br />

development process, software development<br />

practices or standards to be followed, and<br />

procedures to be used for tracking and reporting<br />

progress.<br />

Addresses various aspects of security such as<br />

information assurance, protection of critical<br />

program information, and obtaining security<br />

certification and accreditation if not included in<br />

other documents.<br />

Source<br />

DAG,<br />

AFI 10-602<br />

DAG<br />

AFPD 10-5;<br />

AFI 10-501<br />

AKSS<br />

DAG<br />

Version 1: Jan 2006 44<br />

Air Force Independent Logistics Assessment <strong>Handbook</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!