- Page 1: Department of the Air Force Guide f
- Page 4 and 5: Version 1 January 2006 Air Force In
- Page 6 and 7: D. EVALUATION CRITERIA FOR MILESTON
- Page 8 and 9: Version 1: January 2006 Air Force I
- Page 10 and 11: and implementation before each acqu
- Page 12 and 13: epresent how a product support stra
- Page 14 and 15: Table 3-1. Sustainment Elements Sus
- Page 16 and 17: Capabilities Documents (ICD, CDD, ,
- Page 18 and 19: assessment process. Each team membe
- Page 20 and 21: Table 5-2. Sustainment Element Rati
- Page 22 and 23: esponsibility for tracking and reso
- Page 25: A. The Integrated Defense Acquisiti
- Page 29 and 30: Version 1: Jan 2006 21 Air Force In
- Page 31 and 32: Version 1: Jan 2006 23 Air Force In
- Page 33 and 34: B. Relationship between Reliability
- Page 35 and 36: Figure B-1. Cause and Effect Betwee
- Page 37 and 38: maintenance- and supply-response ti
- Page 39: B-1. RAM Relationships to Sustainme
- Page 42 and 43: Typical Document Request Acquisitio
- Page 44 and 45: C-1. Milestone B Documentation (con
- Page 46 and 47: C-1. Milestone B Documentation (con
- Page 48 and 49: C-1. Milestone B Documentation (con
- Page 50 and 51: Typical Document Request Capability
- Page 52 and 53: C-2. Milestone C Documentation (con
- Page 55 and 56: D. Evaluation Criteria for Mileston
- Page 57 and 58: D-1. Warfighter Capability Requirem
- Page 59 and 60: D-3. Product Support Management The
- Page 61 and 62: D-3. Product Support Management (co
- Page 63 and 64: D-4. Product Support Budgeting and
- Page 65 and 66: D-6. Sustainment Elements of IMP/IM
- Page 67 and 68: D-7. Manpower Manpower factors are
- Page 69 and 70: D-8. Personnel Personnel factors ar
- Page 71 and 72: D-9. Maintenance Acquiring and sust
- Page 73 and 74: D-9. Maintenance (continued) Milest
- Page 75 and 76: D-9. Maintenance (continued) Evalua
- Page 77 and 78:
D-10. Supportability Supportability
- Page 79 and 80:
D-10. Supportability (continued) Ev
- Page 81 and 82:
D-10. Supportability (continued) Ev
- Page 83 and 84:
D-11. Systems Engineering (continue
- Page 85 and 86:
D-11. Systems Engineering (continue
- Page 87 and 88:
D-11. Systems Engineering (continue
- Page 89 and 90:
D-11. Systems Engineering (continue
- Page 91 and 92:
D-12. Data Management Data Manageme
- Page 93 and 94:
D-12. Data Management (continued) E
- Page 95 and 96:
D-13. Supply (continued) Evaluation
- Page 97 and 98:
D-13. Supply (continued) Evaluation
- Page 99 and 100:
D-15. Configuration Management Conf
- Page 101 and 102:
Version 1: Jan 2006 93 Air Force In
- Page 103 and 104:
D-16. Training (continued) Evaluati
- Page 105:
D-17. Assessment References (contin
- Page 108 and 109:
implications of the logistics suppo
- Page 110 and 111:
E-1. Pre-IOC and FOC (continued) Su
- Page 112 and 113:
E-1. Pre-IOC and FOC (continued)
- Page 115 and 116:
F. Evaluation Criteria for Performa
- Page 117 and 118:
F-1. PBL Product Support Strategy (
- Page 119 and 120:
F-1. PBL Product Support Strategy (
- Page 121:
F-1. PBL Product Support Strategy (
- Page 124 and 125:
Figure G-1. Linkage Between System
- Page 126 and 127:
G.6 Review the Contract. The solici
- Page 129 and 130:
H. ILA Meetings and Presentations H
- Page 131:
ecommended certification rating. Th
- Page 134 and 135:
CR—Component Reliability CSI—Cr
- Page 136 and 137:
MOA—Memorandum of Agreement MOU
- Page 138:
XML—eXtensible Markup Language Ve