D-10. Supportability (continued)<br />
Evaluation Criteria<br />
Milestone<br />
B C FRP<br />
• Development of PBL BCA to determine: X<br />
o The relative cost versus benefits of different support strategies.<br />
o The impact and value of performance/cost/schedule/sustainment<br />
tradeoffs.<br />
o Data required to support and justify the PBL strategy.<br />
• PSI performance outcomes/requirements, e.g., mission readiness, logistics X U U<br />
footprint, response times, etc.<br />
• Development of PBL product support concept to include development of X U U<br />
warfighter and support provider agreements.<br />
• Update support strategy within the <strong>Acquisition</strong> Strategy Review (ASR). X U<br />
• Update logistics criteria and parameters with the APB. X<br />
• Logistics and overall sustainment requirements as referenced in the CPD. X U<br />
• Logistics parameters and test objectives in the TEMP. X U<br />
• Acceptable performance in development, test and evaluation, and<br />
X U<br />
operational assessment, to include:<br />
o Mature software capability.<br />
o Acceptable interoperability.<br />
o Acceptable operational supportability.<br />
• Demonstration that the system is affordable throughout the life cycle,<br />
optimally funded, and properly phased for rapid acquisition.<br />
X U<br />
1. System Requirements<br />
• Mission capabilities: Reviewed and modified as final testing and<br />
configuration decisions are made. Emphasis on the capability of the<br />
sustainment strategy to meet overall mission capability requirements.<br />
X<br />
• Reliability: Mission and logistics reliability should clearly meet desired<br />
X<br />
metric targets while supporting the achievement of overall system<br />
performance objectives.<br />
• Maintainability: The effective operation of diagnostics, prognostics, and<br />
X<br />
performance-based maintenance arrangements should be in place or in<br />
transition, meeting previously specified objectives.<br />
• Manpower and Personnel: Goals for both organic and contractor manpower X<br />
requirements should be validated.<br />
• LCCE: Final refinement of LCCs should be validated. X<br />
2. Product Support<br />
• Completed BCA on PBL approach (consistent with evolutionary<br />
X<br />
acquisition/spiral development planning, where applicable).<br />
U<br />
U<br />
U<br />
U<br />
U<br />
Version 1: Jan 2006 71<br />
Air Force Independent Logistics Assessment <strong>Handbook</strong>