D-10. Supportability (continued)<br />

Evaluation Criteria<br />

Milestone<br />

B C FRP<br />

• Development of PBL BCA to determine: X<br />

o The relative cost versus benefits of different support strategies.<br />

o The impact and value of performance/cost/schedule/sustainment<br />

tradeoffs.<br />

o Data required to support and justify the PBL strategy.<br />

• PSI performance outcomes/requirements, e.g., mission readiness, logistics X U U<br />

footprint, response times, etc.<br />

• Development of PBL product support concept to include development of X U U<br />

warfighter and support provider agreements.<br />

• Update support strategy within the <strong>Acquisition</strong> Strategy Review (ASR). X U<br />

• Update logistics criteria and parameters with the APB. X<br />

• Logistics and overall sustainment requirements as referenced in the CPD. X U<br />

• Logistics parameters and test objectives in the TEMP. X U<br />

• Acceptable performance in development, test and evaluation, and<br />

X U<br />

operational assessment, to include:<br />

o Mature software capability.<br />

o Acceptable interoperability.<br />

o Acceptable operational supportability.<br />

• Demonstration that the system is affordable throughout the life cycle,<br />

optimally funded, and properly phased for rapid acquisition.<br />

X U<br />

1. System Requirements<br />

• Mission capabilities: Reviewed and modified as final testing and<br />

configuration decisions are made. Emphasis on the capability of the<br />

sustainment strategy to meet overall mission capability requirements.<br />

X<br />

• Reliability: Mission and logistics reliability should clearly meet desired<br />

X<br />

metric targets while supporting the achievement of overall system<br />

performance objectives.<br />

• Maintainability: The effective operation of diagnostics, prognostics, and<br />

X<br />

performance-based maintenance arrangements should be in place or in<br />

transition, meeting previously specified objectives.<br />

• Manpower and Personnel: Goals for both organic and contractor manpower X<br />

requirements should be validated.<br />

• LCCE: Final refinement of LCCs should be validated. X<br />

2. Product Support<br />

• Completed BCA on PBL approach (consistent with evolutionary<br />

X<br />

acquisition/spiral development planning, where applicable).<br />

U<br />

U<br />

U<br />

U<br />

U<br />

Version 1: Jan 2006 71<br />

Air Force Independent Logistics Assessment <strong>Handbook</strong>