C-1. Milestone B Documentation (continued)<br />

Typical Document<br />

Request<br />

Software<br />

Support/Sustainment Plan<br />

Systems Engineering Plan<br />

(SEP)<br />

System Training Plan<br />

Technical Order<br />

Management Plan (TOMP)<br />

Description<br />

Describes the activities to ensure that<br />

implemented and fielded software<br />

continues to fully support the<br />

operational mission of the software.<br />

Describes the comprehensive, iterative<br />

technical management process that<br />

includes translating operational<br />

requirements into configured systems,<br />

integrating the technical inputs of the<br />

entire design team, managing<br />

interfaces, characterizing and managing<br />

technical risks, transitioning technology<br />

from the technology base into program<br />

specific efforts, and verifying that<br />

designs meet operational needs. It<br />

addresses life-cycle activities using a<br />

concurrent approach to product and<br />

process development as well as<br />

sustainment.<br />

Identifies the resources required to<br />

establish and maintain an effective<br />

training program throughout the<br />

acquisition life cycle. It controls<br />

planning for meeting the training<br />

requirements and identifies personnel<br />

required to install, operate, maintain, or<br />

to otherwise use the system.<br />

Provides management policy, assigns<br />

responsibilities, defines terminology<br />

and specifies procedures for the<br />

system’s TO <strong>Acquisition</strong> Program. This<br />

plan provides basic instructions for<br />

development, contractor Quality<br />

Assurance (QA), verification and<br />

formalization of TOs during the<br />

program acquisition phase, and<br />

maintenance of the TOs after<br />

formalization. The TOMP is an<br />

important management tool which is<br />

mandatory for major programs and<br />

should be considered for all programs.<br />

Source<br />

DAG, AKSS<br />

DAG, DODI<br />

5000.2,<br />

USD(AT&L)<br />

Policy memo<br />

(Feb 04)<br />

DAG, AFI 36-<br />

2201V1<br />

TO 00-5-3<br />

Version 1: Jan 2006 40<br />

Air Force Independent Logistics Assessment <strong>Handbook</strong>