USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
C-2. Milestone C Documentation (continued)<br />
Typical Document<br />
Request<br />
Human Factors<br />
Engineering<br />
(HFE)/Human<br />
Engineering (HE)<br />
Plan<br />
Level Of Repair<br />
Analysis (LORA)<br />
Logistics Support<br />
Analysis (LSA) and<br />
Logistics Support<br />
Analysis Records<br />
(LSAR)<br />
Planned<br />
Maintenance System<br />
(PMS)<br />
Documentation<br />
Post-Production<br />
Support Plan<br />
Preferred Parts<br />
Selection List/<br />
Approved Parts List<br />
Quality Assurance<br />
Plan<br />
Description<br />
Defines the plan to develop and implement<br />
human engineering design criteria, principles,<br />
and practices to achieve mission success<br />
through integration of the human into the<br />
system, subsystem, equipment and facility. The<br />
objectives are to provide work environments<br />
that foster effective procedures, work patterns<br />
and personnel safety and health, which<br />
minimize factors that degrade human<br />
performance or increase error. The objective is<br />
also to minimize personnel and training<br />
requirements within the limits of time, cost and<br />
performance tradeoffs.<br />
Provides an analysis to determine whether an<br />
item should be repaired or discarded and, if<br />
repaired, at what maintenance level. Analyses<br />
are performed and trade-off decisions are made<br />
based on mission requirements as well as<br />
economic and noneconomic considerations.<br />
Provides U.S. Air Force provisioning<br />
instructions and guidance, performance<br />
specifications for Logistics Management<br />
Information (LMI), and DOD <strong>Acquisition</strong><br />
Logistics.<br />
Includes scheduled maintenance instructions<br />
provided on maintenance requirements cards<br />
and maintenance index pages. May be included<br />
in the interactive electronic technical manual.<br />
Identifies the plan to ensure continued<br />
economical logistical support and systems<br />
management of deployed systems after<br />
production cessation.<br />
A list of parts or part types that meets the<br />
system design requirements over its life cycle<br />
and is either recommended or approved for use.<br />
Provides the contractor’s plan and program for<br />
assuring the quality of the system.<br />
Source<br />
DAG, Mil<br />
Hdbk 46855A<br />
DAG<br />
AFMC 23-101,<br />
MIL-PRF-<br />
49506, MIL-<br />
HDBK-502<br />
AKSS, MIL-<br />
PRF-49506,<br />
<strong>Acquisition</strong><br />
Logistics<br />
Guide<br />
AKSS, LCMP,<br />
PPSP Guide<br />
AFMCI 23-<br />
101<br />
DAG, AFI 63-<br />
501<br />
Version 1: Jan 2006 43<br />
Air Force Independent Logistics Assessment <strong>Handbook</strong>