USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
D-3. Product Support Management (continued)<br />
Evaluation Criteria<br />
Milestone<br />
B C FRP<br />
• Do warranty terms and conditions address the program’s risk factors X U U<br />
• Does warranty administration and enforcement include standard<br />
X U U<br />
procedures, including performance measurement, for identifying,<br />
reporting, tracking, and correcting defects and failures covered by the<br />
warranty (Ensure defect reporting, analysis and corrective action<br />
processes are timely and effective.)<br />
• Does the warranty ensure continued contractor responsibility and X U U<br />
involvement beyond delivery and for the entire warranty period and is it<br />
enforceable<br />
• Is the cost-effectiveness assessment of the warranty plan performed<br />
X U<br />
periodically after its initial award<br />
• Are impacts to other related acquisition programs considered when X U U<br />
making product support or program transfer decisions How will support<br />
decisions for this program impact related programs<br />
• Is the sustainment support services contract projected to exceed $100 X U U<br />
million per year requiring PEO/CM management oversight under the<br />
Management and Oversight of <strong>Acquisition</strong> of Services Process<br />
(MOASP)<br />
• Does the Source of Repair Assignment Process decision support<br />
X U U<br />
implementation of a warranty for depot-level maintenance<br />
• Has depot repair partnering been evaluated with regard to potential X U U<br />
warranty repair<br />
• Is achievement of reliability, maintainability and availability design X U U<br />
specification requirements received during functional configuration<br />
audits and has adequate design test assured the design is supportable<br />
• Is the program performing supportability analysis<br />
(http://akss.dau.mil/dag/para 4.4.9) as part of the functional analysis in<br />
the systems engineering process to determine reliability and<br />
maintainability allocations considering total ownership costs<br />
X<br />
Version 1: Jan 2006 53<br />
Air Force Independent Logistics Assessment <strong>Handbook</strong>