D-11. Systems Engineering (continued)<br />

Evaluation Criteria<br />

Milestone<br />

B C FRP<br />

o Conducting training (proponent-Air Education Training Command).<br />

o Planning basing locations (proponent-Operational Command).<br />

o Planning new facilities to support the system (proponent-Operational<br />

Command).<br />

• NEPA decisions result in one or more of the following: X U U<br />

o Categorical Exclusion (CATEX).<br />

o Finding of No Significant Impact (FONSI) based upon an Environmental<br />

Assessment (EA).<br />

o Record of Decision (ROD) based upon an Environmental Impact<br />

Statement (EIS).<br />

o SAF/AQR is the NEPA approval authority for all NEPA documents<br />

where the Program Office is the proponent.<br />

• ESOH considerations include the following: X U U<br />

o Clean Water Act.<br />

o Clean Air Act.<br />

o Air permits.<br />

o National Emissions Standards for Hazardous Air Pollutants.<br />

o National Ambient Air Quality Standards.<br />

o Resource Conservation and Recovery Act.<br />

o Endangered Species Act.<br />

o Federal and state noise abatement standards.<br />

o Federal and state material toxicity standards.<br />

o Federal and state personnel protective equipment standards.<br />

• Acceptance/sign-off of program environmental, system safety, and occupational X X U<br />

health design risks shall be done by the appropriate managing level authority in<br />

accordance with MIL-STD-882/industry standard before IOT&E.<br />

• ESOH Risk Management X U U<br />

o ESOH design requirements are specified, e.g., all systems containing<br />

energetic must comply with insensitive munitions criteria.<br />

o Hazardous risk probability level and severity categories, risk values, risk<br />

categories, and risk acceptance authority criteria are specified.<br />

o ESOH hazards, including hazardous materials, are identified and traced<br />

throughout the life cycle.<br />

o Hazards are eliminated or risks mitigated to an acceptable level. Note<br />

that this process is also referred to as “Pollution Prevention” for<br />

environmental issues.<br />

o Mitigation measure effectiveness is verified.<br />

Version 1: Jan 2006 80<br />

Air Force Independent Logistics Assessment <strong>Handbook</strong>