USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
H. <strong>ILA</strong> Meetings and Presentations<br />
H.1 As noted in Section 5, it is critical that meetings and presentations be conducted to ensure<br />
all individuals participating in the <strong>ILA</strong> understand the process. These presentations offer the<br />
PM an opportunity to educate the <strong>ILA</strong> team on the program and to receive information from<br />
the <strong>ILA</strong> team during the course of the assessment. A discussion of the expected meetings and<br />
presentations is provided here to ensure standardization of <strong>ILA</strong> reporting.<br />
H.2 Pre-Assessment Meeting.<br />
The pre-assessment meeting is conducted to establish coordination/planning among<br />
the team leader, PM, and logistics manager. The following issues should be addressed:<br />
• Confirm the responsibilities of the PO, team leader and team members,<br />
• Confirm the purpose and scope of the review,<br />
• Discuss specific review procedures,<br />
• Coordinate the availability and location of product support and program<br />
documentation (a listing of available documents should be prepared before the <strong>ILA</strong> for<br />
distribution to team members at the pre-brief),<br />
• Clarify specific <strong>ILA</strong> schedule of events/agenda,<br />
• Identify the location of all assessment activities,<br />
• Identify and determine availability of PO personnel to respond to <strong>ILA</strong> team member<br />
questions,<br />
• Necessary security requirements and arrangements, including access to classified<br />
material,<br />
• Conduct of the assessment,<br />
• Issuance of draft and final reports and coordination procedures,<br />
• Post-review procedures to include follow-up on identified issues (as required), and<br />
• Issuance of a certification statement reflecting the results of the assessment.<br />
H.3 Opening Brief.<br />
The opening brief provides the <strong>ILA</strong> team with a foundation of information regarding<br />
program background, its current status, logistics structure and a review of what to expect<br />
during the assessment. It is important to recognize that <strong>ILA</strong> team members may not be<br />
familiar with the subject program, and the opening brief is the best opportunity to provide the<br />
<strong>ILA</strong> team with a basic understanding of the program and provide the necessary background<br />
information to place the program in its proper context. The opening brief consists of the<br />
following:<br />
H.3.1 Program overview (presented by the PM or Deputy PM):<br />
o <strong>Acquisition</strong> Program Baseline (APB) to include status of KPPs and KSAs and<br />
Program Risk assessment,<br />
o A general description of the system (physical as well as functional),<br />
o System interfaces,<br />
o The planned operational use of the system,<br />
o Support strategy (including unique considerations and performance requirements),<br />
Version 1: Jan 2006 121<br />
Air Force Independent Logistics Assessment <strong>Handbook</strong>