D-10. Supportability (continued)<br />

Evaluation Criteria<br />

• Completed, approved and funded product support/sustainment approach to<br />

include:<br />

o Documented performance agreements between the PM, PSI, and the<br />

force provider that define the system’s operational performance<br />

requirements, e.g., readiness, availability, response times, etc.<br />

Milestone<br />

B C FRP<br />

X<br />

o The PM, PSI, and the product support provider(s) (PSP) define<br />

required support metrics necessary to meet the system performance<br />

requirements. Support providers may be public, private, or a mix to<br />

include public/private partnerships. Examples of public PSPs include<br />

Service maintenance depots, Service and <strong>Defense</strong> Logistics Agency<br />

(DLA) inventory control points, and DLA distribution depots.<br />

• Funding commitments commensurate with support provided. X<br />

• Planned PSI/PSP and warfighter implementation structure to include: X<br />

o Integrator accountability for managing and integrating all support<br />

providers to meet established requirements.<br />

o Roles, relationships and functions among PM, PSI, PSPs<br />

(public/private), and warfighter to include funding.<br />

• Comprehensive review of support-related performance and acceptance<br />

X<br />

criteria in a pre-IOC supportability assessment.<br />

o Verify implementation and execution of PBL agreements.<br />

X<br />

o Verify funding of operations and support to required levels.<br />

• Satisfaction of sustainment criteria addressed in Initial Operational Test and<br />

X<br />

Evaluation (IOT&E).<br />

• PBL agreements among PM, PSI, and warfighter, and PM, PSI, and PSPs. X<br />

• Fully funded sustainment program. X<br />

• Pre-IOC review X U<br />

o Confirm design maturity of the system.<br />

o Determine status of correction of any deficiencies identified.<br />

o Confirm configuration control.<br />

o Certify PSI/PSP plans to meet warfighter requirements.<br />

o Verify PSI/PSP agreements/contracts and funding in place.<br />

• Construction on MILCON projects has been initiated and is on track to<br />

support introduction of the new or modified system to the force.<br />

X<br />

Version 1: Jan 2006 72<br />