07.01.2015 Views

USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...

USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...

USAF ILA Handbook - ACC Practice Center - Defense Acquisition ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

D-7. Manpower (continued)<br />

Evaluation Criteria<br />

• Are inherently governmental and exempted commercial functions retained in<br />

organic activities<br />

• Has an evaluation of the manpower pipeline required and/or available to<br />

support a new system been accomplished Does the evaluation consider<br />

manpower constraints when establishing contract specifications to ensure the<br />

human resource demands of the system do not exceed the projected supply<br />

• Are manpower requirements based on task analyses conducted during the<br />

functional allocation process Do they consider all factors including fatigue;<br />

cognitive, physical, sensory overload; environmental conditions (e.g.,<br />

heat/cold); and reduced visibility Were manpower requirements considered in<br />

personnel capabilities, training, and human factors engineering (HFE)<br />

tradeoffs<br />

Milestone<br />

B C FRP<br />

X U<br />

X U<br />

X U<br />

Version 1: Jan 2006 60<br />

Air Force Independent Logistics Assessment <strong>Handbook</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!