Segment 4: Cash Elementary to YMCA<br />
The primary greenway trail will continue its journey from Old Hollow Road to the <strong>Kernersville</strong><br />
YMCA. This segment <strong>of</strong> the trail system is approximately 1.5 miles in length and will consist <strong>of</strong> a 10-footwide<br />
multi-use trail constructed <strong>of</strong> asphalt.<br />
The trail will continue along the existing NCDOT and railroad corridors. Numerous driveways and<br />
road crossings will require proper signage and crosswalk placement.<br />
The trail will stay on the north side <strong>of</strong> West Mountain Street to reduce the number <strong>of</strong> crosswalks due<br />
to the lack <strong>of</strong> feasible space on the south side. The trail will <strong>of</strong>fer an alternative spur connection at West<br />
Mountain Street and Asbury Drive. The consultant recommends that a signaled crosswalk be installed for<br />
this busy intersection.<br />
SEGMENT 4<br />
Primary <strong>Greenway</strong> Segments<br />
Spur Trail <strong>Greenway</strong> Segments<br />
Figure 9. Location <strong>of</strong> Segment 4<br />
PIEDMONT GREENWAY<br />
Final <strong>Master</strong> <strong>Plan</strong> Report • 34