Segment 4: Cash Elementary to YMCA<br />

The primary greenway trail will continue its journey from Old Hollow Road to the <strong>Kernersville</strong><br />

YMCA. This segment <strong>of</strong> the trail system is approximately 1.5 miles in length and will consist <strong>of</strong> a 10-footwide<br />

multi-use trail constructed <strong>of</strong> asphalt.<br />

The trail will continue along the existing NCDOT and railroad corridors. Numerous driveways and<br />

road crossings will require proper signage and crosswalk placement.<br />

The trail will stay on the north side <strong>of</strong> West Mountain Street to reduce the number <strong>of</strong> crosswalks due<br />

to the lack <strong>of</strong> feasible space on the south side. The trail will <strong>of</strong>fer an alternative spur connection at West<br />

Mountain Street and Asbury Drive. The consultant recommends that a signaled crosswalk be installed for<br />

this busy intersection.<br />

SEGMENT 4<br />

Primary <strong>Greenway</strong> Segments<br />

Spur Trail <strong>Greenway</strong> Segments<br />

Figure 9. Location <strong>of</strong> Segment 4<br />

PIEDMONT GREENWAY<br />

Final <strong>Master</strong> <strong>Plan</strong> Report • 34