Segment 8: Civitan Park to Triad Park<br />
This segment <strong>of</strong> the <strong>Piedmont</strong> <strong>Greenway</strong> trail system is approximately 1.7 miles in length and will<br />
consist <strong>of</strong> a 10-foot-wide multi-use trail constructed <strong>of</strong> asphalt and/or concrete where deemed necessary due<br />
to site conditions and maintenance issues.<br />
This segment leaves the urban character <strong>of</strong> <strong>Kernersville</strong> and represents the most challenging link into<br />
Triad Park. Many alternatives were considered for this alignment. To the south there are sidewalk improvements<br />
scheduled, however, there are numerous automobile and trail-user conflicts along West Mountain<br />
Street and/or the railroad ROW.<br />
The <strong>Town</strong> <strong>of</strong> <strong>Kernersville</strong> has already secured some fragmented greenway easements to the north that<br />
would improve the alignment. As the trail leaves Civitan Park along Nelson School Road, the sidewalk system<br />
will need to be extended past Piney Grove Road until reaching the AutoZone store where the trail will<br />
cross Main Street and continue north along the southern side<br />
to the Sara Lee Complex. At this juncture, the trail will leave<br />
the road system and become a multi-use <strong>of</strong>f-road trail.<br />
SEGMENT 8<br />
The trail will follow a small drainage channel until reaching<br />
the <strong>Town</strong> <strong>of</strong> <strong>Kernersville</strong> greenway easement near Gralin<br />
Street. The drainage channel becomes a small section <strong>of</strong> the<br />
southernmost part <strong>of</strong> Reedy Fork Creek as it exits Triad Park.<br />
The trail will continue along the creek's southern bank, taking<br />
advantage <strong>of</strong> some small segments <strong>of</strong> town easements as<br />
far as Triad Park. As the trail enters Triad Park, the <strong>Piedmont</strong><br />
<strong>Greenway</strong> will take advantage <strong>of</strong> the planned and existing<br />
trails. Triad Park is the central hub for the greenway and will<br />
serve as a major trailhead. Trail users will be able to take advantage<br />
<strong>of</strong> the amenities <strong>of</strong> the park and its resources.<br />
Primary <strong>Greenway</strong> Segments<br />
Spur Trail <strong>Greenway</strong> Segments<br />
Figure 16. Location <strong>of</strong> Segment 8<br />
PIEDMONT GREENWAY<br />
Final <strong>Master</strong> <strong>Plan</strong> Report • 42