No. Item Qty. Unit Price Total<br />
XIII. Lake Higgins to Summerfield Elementary. 12,972lf or 2.46 miles<br />
A. OFF ROAD FACILITIES<br />
10' Asphalt Trail 12,672 lf $35.00 $443,520.00<br />
B. ON ROAD FACILITIES<br />
Crosswalks (5) 300 lf $22.00 $6,600.00<br />
C. SITE FURNISHINGS<br />
Bollards 10 each $250.00 $2,500.00<br />
D. SIGNAGE<br />
Mile Markers 4 each $250.00 $1,000.00<br />
Warning Signs 10 each $250.00 $2,500.00<br />
Directional 6 each $250.00 $1,500.00<br />
Minor Trailhead Signs 1 each $1,750.00 $1,750.00<br />
Educational 1 each $2,000.00 $2,000.00<br />
E. LANDSCAPING (Allowance)<br />
Reseed disturbed areas $1,000.00<br />
PHASE THIRTEEN<br />
ITEM<br />
COST<br />
A. OFF ROAD FACILITIES $443,520.00<br />
B. ON ROAD FACILITIES $6,600.00<br />
C. SITE FURNISHINGS $2,500.00<br />
D. SIGNAGE $5,000.00<br />
E. LANDSCAPING $1,000.00<br />
SUBTOTAL $458,620.00<br />
10% Design Fee $45,862.00<br />
15% Contingency $68,793.00<br />
Grand Total Phase Probable Costs<br />
ITEM<br />
COST<br />
A. Core Phase Segments I - X<br />
I $437,125.00<br />
II $671,300.00<br />
III $798,112.50<br />
IV $440,237.50<br />
V $165,650.00<br />
VI $590,800.00<br />
VII $381,937.50<br />
VIII $393,287.50<br />
VIIII $644,750.00<br />
X $571,800.00<br />
$5,095,000.00<br />
B. Alternative Phase Segemnets XI, XII, XIII<br />
XI $1,254,162.50<br />
XII $313,200.00<br />
XIII $573,275.00<br />
$2,140,637.50<br />
GRAND TOTAL: $7,235,637.50<br />
Primary <strong>Greenway</strong> (18.9 miles) cost per mile = $269,576.78<br />
Alternative Spur <strong>Greenway</strong> Segments (8.5 miles) cost per mile = $251,839.70<br />
Figure 41. Total Phase Cost Estimates<br />
GRAND TOTAL: $573,275.00<br />
Figure 40. Phase 13 Cost Estimates<br />
PIEDMONT GREENWAY<br />
Final <strong>Master</strong> <strong>Plan</strong> Report 67