Piedmont Greenway Master Plan - Town of Kernersville
Piedmont Greenway Master Plan - Town of Kernersville
Piedmont Greenway Master Plan - Town of Kernersville
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Segment 7: YMCA to Civitan Park<br />
The <strong>Piedmont</strong> <strong>Greenway</strong> will leave the railroad corridor and continue east toward Fourth-<strong>of</strong>-July Park,<br />
<strong>Kernersville</strong> Elementary School and Civitan Park, following West Mountain Street on the northern side. A<br />
major access point to the YMCA spur trail will occur at Asbury Street and Bodenhamer and at Nelson Street<br />
for the Kerners Mill Creek spur trail. This segment will be a 10-foot-wide asphalt and/or gravel trail. <strong>Greenway</strong><br />
kiosks and markers will be placed along the trail for mileage as well as natural and historical information.<br />
Including the two spur trails, there are two major destinations in this segment <strong>of</strong> the <strong>Greenway</strong>. Fourth<strong>of</strong>-July<br />
Park will <strong>of</strong>fer a minor trailhead and make available use <strong>of</strong> its existing parking and bathroom facilities.<br />
<strong>Kernersville</strong> Elementary School is the second destination, allowing students to use the trail system.<br />
There are presently two alternatives to reaching Civitan Park in this segment. The first involves using<br />
Fourth <strong>of</strong> July Park as an extension <strong>of</strong> the primary trail, then <strong>Kernersville</strong> Elementary School’s northern<br />
boundary along the railroad ROW until reaching Nelson Street<br />
and finally Civitan Park. This first alternative is the most desirable<br />
because it <strong>of</strong>fers a true <strong>of</strong>f-road trail <strong>of</strong> approximately 0.6<br />
miles.<br />
The second alternative would be to use the existing<br />
sidewalk that fronts Fourth <strong>of</strong> July Park and <strong>Kernersville</strong> Elementary<br />
School along West Mountain Street, then continuing<br />
north along the sidewalk at Nelson School Road to Civitan<br />
Park. The major advantage to this alternative is that the sidewalks<br />
are already in place for this 0.7 mile segment. However,<br />
the trail would be restricted to a sidewalk width because<br />
<strong>of</strong> the lack <strong>of</strong> ROW along the road.<br />
SEGMENT 7<br />
Civitan Park can be reached by either trail alternative via<br />
Nelson School Road and the existing railroad crossing found<br />
here. Proper signage and intersection upgrades will be added<br />
to the existing railroad crossing for pedestrian and bicycle trail<br />
users.<br />
Primary <strong>Greenway</strong> Segments<br />
Spur Trail <strong>Greenway</strong> Segments<br />
Figure 14. Location <strong>of</strong> Segment 7<br />
PIEDMONT GREENWAY<br />
Final <strong>Master</strong> <strong>Plan</strong> Report • 40