Piedmont Greenway Master Plan - Town of Kernersville
Piedmont Greenway Master Plan - Town of Kernersville
Piedmont Greenway Master Plan - Town of Kernersville
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Segment 6: Kerners Mill Creek Spur Trail<br />
This segment <strong>of</strong> the trail system is approximately 2.4 miles in length and will consist <strong>of</strong> a 10-foot-wide<br />
multi-use trail constructed <strong>of</strong> asphalt, gravel, boardwalk and/or concrete where deemed necessary due to site<br />
conditions and maintenance issues.<br />
The Kerners Mill Creek spur trail will allow residents and visitors <strong>of</strong> the Kerners Mill Creek corridor to<br />
access the primary trail. The trail can be accessed either via the YMCA spur trail or via the primary trail at<br />
Civitan Park. The spur trail link will provide views <strong>of</strong> remaining farmland in the central downtown core <strong>of</strong><br />
<strong>Kernersville</strong>. Old <strong>Kernersville</strong> Lake Park will double as a destination and will also <strong>of</strong>fer parking and park<br />
amenities. At the present time there are no maps available that show the built-out parking areas and structures<br />
for Old <strong>Kernersville</strong> Lake Park.<br />
The spur trail <strong>of</strong>fers an opportunity to provide a link to <strong>Kernersville</strong> Elementary School via a portion<br />
<strong>of</strong> the existing railroad corridor between Cherry Street and Nelson Street. The spur trail follows the concept<br />
<strong>of</strong> the primary <strong>Piedmont</strong> <strong>Greenway</strong> System by providing<br />
school access including recreational and educational opportunities<br />
for students and trail users.<br />
SEGMENT 6<br />
Primary <strong>Greenway</strong> Segments<br />
Spur Trail <strong>Greenway</strong> Segments<br />
Figure 13. Location <strong>of</strong> Segment 6<br />
PIEDMONT GREENWAY<br />
Final <strong>Master</strong> <strong>Plan</strong> Report • 38