its value. It should be noted that if the acquisition <strong>of</strong> uplands is required for the greenway, acquisition costs<br />

would be substantially increased.<br />

The acquisition cost per acre is based on recent sales <strong>of</strong> property in the corridor. Recent sales in the<br />

corridor (a general fee simple cost for Guilford and Forsyth Counties) are between $6,000 per acre to $5,000<br />

per acre on average. The price per acre establishes a general range for the cost <strong>of</strong> property in the <strong>Piedmont</strong><br />

<strong>Greenway</strong> corridor. Costs may be higher or lower.<br />

Based on this average cost, the estimated easement acquisition costs for the <strong>Greenway</strong> corridor is as<br />

follows:<br />

$5,000/acre x 92.00 acres = $460,000<br />

Based on the experience <strong>of</strong> the <strong>Piedmont</strong> Land Conservancy in negotiating the acquisition <strong>of</strong> land in<br />

the region, it is reasonable to also assume that acquisition costs for the <strong>Piedmont</strong> <strong>Greenway</strong> could be significantly<br />

reduced by securing the donation <strong>of</strong> land or conservation easements.<br />

Pre-acquisition Costs<br />

Pre-acquisition costs include the cost <strong>of</strong> those services necessary to complete the acquisition <strong>of</strong> the<br />

corridor. These services are appraisals, surveys, title reports and environmental audits. Pre-acquisition<br />

costs vary widely, depending on the contractor used and the standard <strong>of</strong> service required. In general, preacquisition<br />

costs for greenways are considerably higher than for other types <strong>of</strong> parkland due to the appraisal<br />

problems posed by linear parcels. At this time, pre-acquisition costs are not available for the <strong>Piedmont</strong><br />

<strong>Greenway</strong> corridor.<br />

It should, however, be noted that pre-acquisition costs to date for the donation <strong>of</strong> land or conservation<br />

easements for greenways have been very low. If a property owner donating land or a conservation easement<br />

is not interested in the federal income tax benefits available for such a donation, it will not be necessary to<br />

obtain an appraisal. Further, due to the fact that floodplain properties do not generally have a history <strong>of</strong> any<br />

past use, the presence <strong>of</strong> hazardous or toxic waste is unlikely. Therefore, the acquisition <strong>of</strong> such properties<br />

will probably not warrant the expense <strong>of</strong> an environmental audit.<br />

Accurate boundary surveys and title information will be necessary for the acquisition <strong>of</strong> any parcel <strong>of</strong><br />

land in the <strong>Piedmont</strong> <strong>Greenway</strong> corridor.<br />

PIEDMONT GREENWAY<br />

Final <strong>Master</strong> <strong>Plan</strong> Report 70