01.02.2015 Views

Joint Annual Performance Review 2007 - Ministry of Health

Joint Annual Performance Review 2007 - Ministry of Health

Joint Annual Performance Review 2007 - Ministry of Health

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INSTITUTIONAL DEVELOPMENT<br />

Introduction<br />

The work <strong>of</strong> the Institutional Development Working Group is guided by the institutional<br />

challenges identified in the <strong>Health</strong> Sector Strategic Plan 2003-<strong>2007</strong>. This section <strong>of</strong> the report<br />

identifies the current situation and achievements, constraints and priorities for each <strong>of</strong> the four<br />

strategies identified in the plan.<br />

Current Situation and Achievements<br />

Strategy 17 - Organization and management reform <strong>of</strong> structure, systems and<br />

procedures <strong>of</strong> the <strong>Ministry</strong> <strong>of</strong> <strong>Health</strong> (MoH) to respond effectively to change.<br />

There has been considerable progress made in this area during 2006. Based on the functional<br />

analysis report and the approval by High Level Group, and with the technical support from<br />

OPM, the incentive reform process began with the design <strong>of</strong> the Merit- Based Pay Initiative<br />

(MBPI) scheme .The design was discussed in several meetings <strong>of</strong> the High Level Working<br />

Group attended by representatives from CAR, MEF and <strong>Health</strong> Partners and finally was<br />

agreed on 14 November, 2006. Based on the agreement, a draft operational manual for the<br />

implementation was developed and it is in the final stage <strong>of</strong> review by <strong>Health</strong> Partners. The<br />

funding mechanism for the MBPI Scheme was finalized and agreed in a High Level Working<br />

Group and <strong>Health</strong> Partners meeting on 28, November, 2006 .The scheme will be funded<br />

jointly by Government and <strong>Health</strong> Partners following the Sub Decree 98 .Based on the<br />

agreement, a draft Memorandum <strong>of</strong> Understanding (MoU) was prepared and is in the final<br />

stage <strong>of</strong> review by <strong>Health</strong> Partners. The scheme will be implemented to cover 160 positions at<br />

the central MoH during <strong>2007</strong> and based on the lessons learnt and experience gained; the<br />

scheme will be extended to cover 2 PHDs and 2 National Programmes<br />

Under Institutional Development Programme, the sub sector (Primary <strong>Health</strong> Care; Hospital<br />

Services; National Programmes and Central MoH) assessments were completed with the<br />

technical support from OPM .The findings and recommendations were presented in national<br />

level workshop during 19-20 October, 2006. Based on the feedback, IDP Synthesis report was<br />

prepared incorporating all the essential elements <strong>of</strong> the sub sector reports and was presented<br />

to IDWG in January, <strong>2007</strong>.The IDP synthesis report is <strong>of</strong> the key documents for Mid Term<br />

<strong>Review</strong>.<br />

Standard staffing levels for referral hospitals and health centres have been developed and<br />

these standards have been approved and disseminated and incorporated into the HR database<br />

so that variances can be reported.<br />

To address the mal-distribution <strong>of</strong> staff and attempt to attract staff to remote geographical<br />

areas, the MoH follows strictly the Royal Government Circular on the implementation <strong>of</strong><br />

annual cadre plan and also identified the different difficult regions and made the interministerial<br />

Prakas between MoH and MEF on the use <strong>of</strong> equity fund.<br />

A Priority Mission Group in Kampong Trach District has been continued its implementation.<br />

Further proposals for additional PMGs in Takeo province and in the North West region <strong>of</strong><br />

Cambodia have been prepared and submitted to CAR for consideration.<br />

- 70 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!