12.03.2015 Views

BD01 System – 40 ... 160 A - GRUP DAP

BD01 System – 40 ... 160 A - GRUP DAP

BD01 System – 40 ... 160 A - GRUP DAP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

© Siemens AG 2007<br />

BD2 <strong>System</strong> — <strong>160</strong> ... 1250 A<br />

Comparison of busbar trunking and cable installation systems<br />

Feature Busbar trunking installation Cable installation<br />

TTA assembly × –<br />

Mechanical safety High Low<br />

Fire load Low High<br />

Temperature characteristic<br />

<strong>System</strong> structure<br />

Protective devices for loads<br />

Ambient temperature<br />

according to IEC/EN 60439-1 and -2<br />

max. +<strong>40</strong> °C and +35 °C on a 24 hour average<br />

Clear due to linear system structure with in-line load<br />

tap-offs via tap-off units<br />

In the tap-off unit: means direct and immediate<br />

on-the-spot identification of assignment to consumer<br />

Engineering information<br />

According to DIN 57298 Part 4/<br />

VDE 0298 Part 4/2.88 loads are based on +30 °C.<br />

Very large accumulation of cables at feed point due to<br />

point-to-point supply of loads from central power<br />

distribution unit<br />

Centrally in the distribution board: makes the assignment<br />

to the load not directly verifiable. It is necessary<br />

to rely on correct labeling of the cables and loads.<br />

Space requirement Low High as the corresponding distribution board is<br />

required. Routing criteria (cable accumulation, type of<br />

routing, current-carrying capacity, etc.) must be<br />

complied with.<br />

Retrofitting capability if consumer<br />

tap-offs changed<br />

Great flexibility due to tap-off points in the trunking unit<br />

and a great number of different tap-off units<br />

Planning and engineering<br />

Simple and fast with EDP-aided planning tools being<br />

used<br />

Dimensioning (current, voltage drop, Not complex<br />

protective earth conditions)<br />

Only possible at great expense. Laying additional<br />

cables from the central distribution board to the<br />

consumer.<br />

Highly intensive engineering (distribution and cable<br />

layouts, cable plans, etc.)<br />

Very complex<br />

Fault location Low High<br />

Fire barrier Type-tested, ex-works Dependent on the work standard applied on the<br />

building site<br />

Functional endurance<br />

Tested functional endurance according to<br />

DIN 4102-12<br />

Dependent on the work standard applied on the<br />

building site<br />

Electromagnetic interference Low, due to sheet steel and conductor<br />

configuration<br />

Relatively high with a standard cable<br />

Mounting<br />

Very little fitting materials and tools required,<br />

short mounting times<br />

Complex mounting materials and a comprehensive<br />

range of tools required, long mounting times<br />

Weight Up to l of the comparable cable weight Up to 3-times the busbar trunking system weight<br />

Halogen and PVC free Trunking units are always halogen and PVC free Standard cables are not always halogen and PVC free<br />

5<br />

Siemens LV 70 · 2006<br />

5/93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!