12.03.2015 Views

BD01 System – 40 ... 160 A - GRUP DAP

BD01 System – 40 ... 160 A - GRUP DAP

BD01 System – 40 ... 160 A - GRUP DAP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

© Siemens AG 2007<br />

Busbar Trunking <strong>System</strong>s, Overview<br />

Busbars instead of cables<br />

■ Overview<br />

Easier when it comes to planning<br />

Easy to plan, quick to install and flexible to use: Siemens busbar<br />

trunking systems are the economical answer for conveying<br />

power into any building. The power distribution system can be<br />

precisely planned from the total load rating and the type and<br />

number of loads. Clarity is assured by the line-shaped network<br />

topology with regularly arranged load feeders. All applications<br />

can be implemented in less time and space with standardized<br />

sizes.<br />

Quicker when it comes to installing<br />

Benefits during installation: busbar trunking systems can be installed<br />

by two persons, saving time and money compared to the<br />

costly cable installation method. Installation errors are practically<br />

ruled out by the safe and user-guided connection technology.<br />

No special tools are required. Another benefit for quick installation:<br />

Siemens busbar trunking systems are easy to fasten<br />

and have large intervals between supports (busbars up to 4 m,<br />

cables every 1.5 m).<br />

Siemens busbar trunking systems are an economical alternative<br />

to the cable installation method.<br />

High short-circuit resistance and<br />

minimum fire load result in greater safety<br />

A step-ahead in terms of safety – be it short-circuit resistance or<br />

fire load. For example, the BD2A-250 busbar trunking systems<br />

have a fire load of only 1.32 kWh/m; comparable cables (NYY<br />

4× 95/50mm 2 ) have 5.19 kWh/m by contrast. And the busbars<br />

are halogen-free. Siemens busbar trunking systems have a high<br />

short-circuit resistance. Also, the near-load protection against<br />

short-circuiting simplifies troubleshooting.<br />

2<br />

High fire load with cables<br />

With cable installation, new loads are connected by way of an additional<br />

sub-distribution board, which is costly and time-consuming<br />

Tap-off units near the loads make local arrangements more transparent<br />

Low fire load with busbar trunking<br />

More flexible in case of expansions and modifications<br />

If the power distribution system has to be adapted to new<br />

requirements, the busbar will take you quicker to your goal.<br />

For example, new tap-off units can simply be mounted on the<br />

tap-off points. The system can be expanded and modified without<br />

difficulty. Tap-off units and system parts increase the flexibility.<br />

Cost-intensive downtimes are eliminated or minimized. The<br />

power distribution system enables faultless operation with high<br />

user-friendliness and safety.<br />

Siemens LV 70 · 2006<br />

2/11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!