BD2 <strong>System</strong> — <strong>160</strong> ... 1250 A<br />

Fire barriers<br />

Installing trunking units with fire barriers<br />

Recommended minimum dimensions of ceiling or wall cut-out<br />

c<br />

28–82 mm<br />

Current up to<br />

system<br />

a 1)<br />

mm<br />

b<br />

mm<br />

<strong>40</strong>0 A 90 200<br />

1250 A 150 200<br />

1<br />

Positioning in fire ceiling<br />

b<br />

a<br />

NSV0_01035<br />

Trunking units with<br />

Tap-off unit<br />

BD2-AK1...,<br />

BD2-AK02..., BD2-AK2...,<br />

BD2-AK03..., BD2-AK3...<br />

c<br />

mm<br />

125<br />

Tap-off unit<br />

200<br />

BD2-AK04..., BD2-AK05..., BD2-AK06...<br />

BD2-BWV or BD2-BDV<br />

200<br />

(with or without tap-off unit)<br />

BD2.-...-EE<br />

200<br />

(with or without tap-off unit)<br />

1) For Z units depending on the lengths X*, Y*.<br />

100<br />

a<br />

b<br />

NSV0_01036<br />

1<br />

Positioning in fire wall<br />

NSV0_01037<br />

1<br />

NSV0_01038<br />

250 mm<br />

1<br />

For installing trunking units with fire barriers, the following points<br />

must be observed in addition to correct positioning:<br />

• Horizontally mounted busbar runs must be supported by a<br />

fixing bracket fitted approx. 500 mm before and after the<br />

structural element they pass through.<br />

• The space $ surrounding the busbar trunking unit within the<br />

structural element it passes through must be packed with<br />

mineral-based mortar or ZZ fire barrier sealant TS90.<br />

• The gaps between PROMATECT-H(L) panels, the busbar<br />

trunking unit and the structural element must be sealed with<br />

ZZ fire barrier sealant TS90 (included as standard if panels are<br />

required).<br />

• The mortar or ZZ fire barrier sealant TS90 must conform to the<br />

applicable regulations for establishing fire resistance rating or<br />

the construction of the wall or ceiling (e.g. DIN 1045 and<br />

DIN 1053 Part 1).<br />

• The installation must be carried out according to pertinent<br />

building regulations (included as standard).<br />

5<br />

ZZ fire barrier sealant TS90 is available from:<br />

Diederich Industrievertretung<br />

(Brandschutztechnik)<br />

Cologne<br />

Tel.: +49(0)221/96652-0<br />

Fax: +49 (0) 2 21 / 9 66 52-2.<br />

NSV0_01039<br />

Siemens LV 70 · 2006<br />

5/101