BD2 <strong>System</strong> — <strong>160</strong> ... 1250 A<br />
Fire barriers<br />
Installing trunking units with fire barriers<br />
Recommended minimum dimensions of ceiling or wall cut-out<br />
c<br />
28–82 mm<br />
Current up to<br />
system<br />
a 1)<br />
mm<br />
b<br />
mm<br />
<strong>40</strong>0 A 90 200<br />
1250 A 150 200<br />
1<br />
Positioning in fire ceiling<br />
b<br />
a<br />
NSV0_01035<br />
Trunking units with<br />
Tap-off unit<br />
BD2-AK1...,<br />
BD2-AK02..., BD2-AK2...,<br />
BD2-AK03..., BD2-AK3...<br />
c<br />
mm<br />
125<br />
Tap-off unit<br />
200<br />
BD2-AK04..., BD2-AK05..., BD2-AK06...<br />
BD2-BWV or BD2-BDV<br />
200<br />
(with or without tap-off unit)<br />
BD2.-...-EE<br />
200<br />
(with or without tap-off unit)<br />
1) For Z units depending on the lengths X*, Y*.<br />
100<br />
a<br />
b<br />
NSV0_01036<br />
1<br />
Positioning in fire wall<br />
NSV0_01037<br />
1<br />
NSV0_01038<br />
250 mm<br />
1<br />
For installing trunking units with fire barriers, the following points<br />
must be observed in addition to correct positioning:<br />
• Horizontally mounted busbar runs must be supported by a<br />
fixing bracket fitted approx. 500 mm before and after the<br />
structural element they pass through.<br />
• The space $ surrounding the busbar trunking unit within the<br />
structural element it passes through must be packed with<br />
mineral-based mortar or ZZ fire barrier sealant TS90.<br />
• The gaps between PROMATECT-H(L) panels, the busbar<br />
trunking unit and the structural element must be sealed with<br />
ZZ fire barrier sealant TS90 (included as standard if panels are<br />
required).<br />
• The mortar or ZZ fire barrier sealant TS90 must conform to the<br />
applicable regulations for establishing fire resistance rating or<br />
the construction of the wall or ceiling (e.g. DIN 1045 and<br />
DIN 1053 Part 1).<br />
• The installation must be carried out according to pertinent<br />
building regulations (included as standard).<br />
5<br />
ZZ fire barrier sealant TS90 is available from:<br />
Diederich Industrievertretung<br />
(Brandschutztechnik)<br />
Cologne<br />
Tel.: +49(0)221/96652-0<br />
Fax: +49 (0) 2 21 / 9 66 52-2.<br />
NSV0_01039<br />
Siemens LV 70 · 2006<br />
5/101