TYPE: Motion SUBMITTED BY: Engineering DATE: 6/25/12<br />

DESCRIPTION: ____.....:2::,.:0=-1:...:2:......=S=tr=e=et:....:R,..:;e::.!h.:,::a::b:.!!;iIi:.::ta::.:.ti:..;::0.:..:.n..:..,R.:,::e:;,.:.v=e!...!:re'--!L::.:.n.:....;&=-=D:..::o:.:..;rc::.:.h.:,::e:..:::s~te::.:..r..:..,R.:.::d~______<br />

Award <strong>of</strong> Contract Districts 1 & 2<br />

SUPPORTS THE FOLLOWING APPLICABLE VILLAGE GOALS: <br />

I X I Financially Stable Government<br />

X Safe Place to Live<br />

. X . Cost Effective SelVices Responsive to Citizens Downtown as a Community Focal Point<br />

• Open Government wi Involved Citizens Regional Partnerships<br />

COMMITTEE ACTION:<br />

DATE:<br />

BACKGROUND:<br />

On June 5, 2012 bids were opened for the rehabilitation <strong>of</strong> Dorchester Road and Revere Lane. This<br />

work consists <strong>of</strong> the removal <strong>of</strong> the pavement and curb and gutter on Revere Lane. Dorchester Road<br />

will be widened to a standard <strong>Village</strong> width and curb and gutter will be added. The drainage will be<br />

updated and or replaced on both streets.<br />

KEY ISSUES:<br />

• Seven (7) bids were submitted ranging from $480,613.20 to a high <strong>of</strong> $608,221.45.<br />

• The low responsive and responsible bid was submitted by A Lamp Concrete Contractors,<br />

Incorporated <strong>of</strong> Schaumburg, Illinois in the amount <strong>of</strong> $480,613.20. The engineer's estimate<br />

was $502,868.90.<br />

• $332,000 was budgeted for Revere and $31,134 for Dorchester. The total bid exceeds the<br />

original budget by $117,479.<br />

• After the budget was adopted, Revere was identified as needing far more reconstruction than<br />

originally anticipated. Our total road maintenance program this year has come in well under<br />

budget and a portion <strong>of</strong> the already achieved savings will be allocated to fund the gap in this bid.<br />

• Construction observation will be completed by the Department <strong>of</strong> Engineering.<br />

ALTERNATIVES:<br />

1. Award the contract to A Lamp Concrete Contractors, Inc., in the amount <strong>of</strong> $480,613.20.<br />

2. Award the contract to another bidder.<br />

3. Refer back to Staff with comments.<br />

RECOMMENDATION:<br />

It is recommended that the contract be awarded to A Lamp Concrete Contractors, Incorporated in the <br />

amount <strong>of</strong> $480,613.20. <br />

BUDGET IMPACT:<br />

Funding for this project is appropriated in the CY 2012 budget using both MFT funds and Capital <br />

improvement funds. The break out in funding is as follows; <br />

• $341,000 <strong>of</strong> MFT funds<br />

• $139,613 <strong>of</strong> Capital funds<br />

ACTION REQUIRED:<br />

Motion to award the contract for the 2012 Street Rehabilitation Revere Ln & Dorchester Rd Project to A <br />

Lamp Concrete Contractors, Incorporated <strong>of</strong> Schaumburg, Illinois in the amount <strong>of</strong> $480,613.20.