TYPE: Motion SUBMITTED BY: Engineering DATE: 6/25/12<br />

DESCRIPTION: ____....:2:::.::0~1=-=2=__=S.:.:.tr.:.ee:::::.;t'_'_R....!.:e=h=a=b=ilic:.:::ta::.:::ti.:.o:..:.n...:....R=e:..:.,ve=r=e:...,:L::.:..n!...;&=D:...::::o,,-,rc::.:.,h=e=st=e;!..r.:....:R~d_______<br />

Award <strong>of</strong> Contract Districts 1 & 2<br />

SUPPORTS THE FOLLOWING APPLICABLE VILLAGE GOALS:<br />

Financially Stable Government X Safe Place to Live<br />

~<br />

X Cost Effective Services Responsive to Citizens Downtown as a Community Focal Point<br />

Open Government wi Involved Citizens Regional Partnerships<br />

COMMITTEE ACTION:<br />

DATE:<br />

BACKGROUND: <br />

On June 5, 2012 bids were opened for the rehabilitation <strong>of</strong> Dorchester Road and Revere Lane. This <br />

work consists <strong>of</strong> the removal <strong>of</strong> the pavement and curb and gutter on Revere Lane. Dorchester Road <br />

will be widened to a standard <strong>Village</strong> width and curb and gutter will be added. The drainage will be <br />

updated and or replaced on both streets. <br />

KEY ISSUES:<br />

• Seven (7) bids were submitted ranging from $480,613.20 to a high <strong>of</strong> $608,221.45.<br />

• The low responsive and responsible bid was submitted by A Lamp Concrete Contractors,<br />

Incorporated <strong>of</strong> Schaumburg, Illinois in the amount <strong>of</strong> $480,613.20. The engineer's estimate<br />

was $502,868.90.<br />

• $332,000 was budgeted for Revere and $31,134 for Dorchester. The total bid exceeds the<br />

original budget by $117,479.<br />

• After the budget was adopted, Revere was identified as needing far more reconstruction than<br />

originally anticipated. Our total road maintenance program this year has come in well under<br />

budget and a portion <strong>of</strong> the already achieved savings will be allocated to fund the gap in this bid.<br />

• Construction observation will be completed by the Department <strong>of</strong> Engineering.<br />

ALTERNATIVES:<br />

1. Award the contract to A Lamp Concrete Contractors, Inc., in the amount <strong>of</strong> $480,613.20.<br />

2. Award the contract to another bidder.<br />

3. Refer back to Staff with comments.<br />

RECOMMENDATION: <br />

It is recommended that the contract be awarded to A Lamp Concrete Contractors, Incorporated in the <br />

amount <strong>of</strong> $480,613.20. <br />

BUDGET IMPACT: <br />

Funding for this project is appropriated in the CY 2012 budget using both MFT funds and Capital <br />

improvement funds. The break out in funding is as follows; <br />

• $341,000 <strong>of</strong> MFT funds<br />

• $139,613 <strong>of</strong> Capital funds<br />

ACTION REQUIRED: <br />

Motion to award the contract for the 2012 Street Rehabilitation Revere Ln & Dorchester Rd Project to A <br />

Lamp Concrete Contractors, Incorporated <strong>of</strong> Schaumburg, Illinois in the amount <strong>of</strong> $480,613.20.