DEPARTMENT <strong>of</strong> <br />
ENGINEERING <br />
Memo<br />
To: Reid Ottesen <br />
From: George S Ruppert <br />
cc:<br />
Mike Danecki, Matt Barry<br />
Date: 6/21/2012<br />
Re: Dorchester &Revere Funding and Budget Impacts<br />
As part <strong>of</strong> the CY 2012 budget, $332,000 <strong>of</strong> MFT funding was budgeted for the Street Rehab Program<br />
(Revere Drive). Additionally, $31,134 in funds were included in the Resurfacing Program for the<br />
widening and resurfacing <strong>of</strong> Dorchester. m Quentin to Crescent and Revere Lane from the cui de sac<br />
to the west bubble.<br />
As the design progressed it became clear that the budgeted amount was not going to be enough to<br />
cover what needed to be done. Unforeseen items in the design included the following:<br />
• Extensive drainage improvements are needed on both streets to improve the drainage and the<br />
longevity <strong>of</strong> the road surface.<br />
• Full curb and gutter removal is needed on Revere rather than just sectional replacement.<br />
• Full pavement removal was expanded on Revere to accommodate the removal <strong>of</strong> the entire<br />
existing pavement section.<br />
FUNDING<br />
• $332,000 budget for Revere<br />
• $31 ,134 budget for Dorchester<br />
2012 Savings in Street Program<br />
• $138,982 Curb and Gutter Concrete Edging Extension Program<br />
• $9,000 <strong>of</strong> MFT savings from the street resurfacing program<br />
• $1,000 in the 50/50 curb and apron program remaining<br />
$148,982 in savings have already been identified in the street program. It is proposed that $117,479 <strong>of</strong><br />
these savings be reallocated to complete the Revere/Dorchester project.<br />
1