Installation Manual
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Important:<br />
An IP-DECT system cannot be deployed along a DECT system on the same PCX node.<br />
<strong>Installation</strong>, configuration and maintenance of IP-DECT system is described in the following<br />
Alcatel-Lucent documentation:<br />
- IM/4080 IP-DECT installation manual<br />
- AM/4080 IP DECT administrator manual<br />
- AM/4080 IP-DECT advanced data manual<br />
- IM/4080 IP-DECT CE manual for SIP connectivity<br />
- IM/4080 IP-DECT Site Survey Kit (SSK) deployment manual<br />
Note:<br />
For any installation, a preliminary study must be carried out using coverage tools. The bases are then<br />
installed according to the results of this study.<br />
4.11.1.1 Connection and power<br />
Usually the cabinets will be fixed to existing walls in the positions determined by the Site<br />
Survey. Do not mount the 4080 IP-DECT to a metal wall<br />
The power for the 4080 IP-DECT is supplied via the Ethernet cable, PoE (IEEE 802.3af).<br />
- Voltage at the DAP: minimum 36 Volts, maximum 57 Volts<br />
- Connector: Standard RJ45 connector, using the spare wires pins (wires).<br />
Figure 4.71: Pin Layout Ethernet Connector RJ45 on the DAP<br />
The 4080 IP-DECT access points are fitted with 2 LEDs that provide information about the<br />
status.<br />
- Top LED – Yellow<br />
This LED represents the status of the 4080 IP-DECT.<br />
LED Status (Top LED, Yellow)<br />
Off<br />
Meaning<br />
No power<br />
0,5 sec. On - 0,5 sec. Off Loading software/firmware<br />
Short flash every 0,25 seconds<br />
IP Network error (not connected, no DHCP/TFTP<br />
server, no DAP Controller<br />
4-103