29.06.2015 Views

Installation Manual

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Important:<br />

An IP-DECT system cannot be deployed along a DECT system on the same PCX node.<br />

<strong>Installation</strong>, configuration and maintenance of IP-DECT system is described in the following<br />

Alcatel-Lucent documentation:<br />

- IM/4080 IP-DECT installation manual<br />

- AM/4080 IP DECT administrator manual<br />

- AM/4080 IP-DECT advanced data manual<br />

- IM/4080 IP-DECT CE manual for SIP connectivity<br />

- IM/4080 IP-DECT Site Survey Kit (SSK) deployment manual<br />

Note:<br />

For any installation, a preliminary study must be carried out using coverage tools. The bases are then<br />

installed according to the results of this study.<br />

4.11.1.1 Connection and power<br />

Usually the cabinets will be fixed to existing walls in the positions determined by the Site<br />

Survey. Do not mount the 4080 IP-DECT to a metal wall<br />

The power for the 4080 IP-DECT is supplied via the Ethernet cable, PoE (IEEE 802.3af).<br />

- Voltage at the DAP: minimum 36 Volts, maximum 57 Volts<br />

- Connector: Standard RJ45 connector, using the spare wires pins (wires).<br />

Figure 4.71: Pin Layout Ethernet Connector RJ45 on the DAP<br />

The 4080 IP-DECT access points are fitted with 2 LEDs that provide information about the<br />

status.<br />

- Top LED – Yellow<br />

This LED represents the status of the 4080 IP-DECT.<br />

LED Status (Top LED, Yellow)<br />

Off<br />

Meaning<br />

No power<br />

0,5 sec. On - 0,5 sec. Off Loading software/firmware<br />

Short flash every 0,25 seconds<br />

IP Network error (not connected, no DHCP/TFTP<br />

server, no DAP Controller<br />

4-103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!