26.11.2012 Views

ECOPROBE 5 - rs dynamics

ECOPROBE 5 - rs dynamics

ECOPROBE 5 - rs dynamics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MEASURING – STANDARD GRID<br />

• Make a hole at the fi<strong>rs</strong>t station of the new locality using a brace or a<br />

similar field tool (never use the sampling probe).<br />

• Pull out the brace and with minimum delay insert the probe vertically<br />

straight down. Do not rotate the probe while inserting it into the hole as<br />

rotation may let soil into the probe tip perforation and prevent air from<br />

entering into the probe.<br />

• Make sure that the hole is quickly and perfectly sealed with the probe<br />

sealing cone which can be moved up or down.<br />

• After inserting the probe into the hole, ensure that soil vapor can be withdrawn from the sampling<br />

probe by trying to suck air from the probe outlet. The probe must allow easy pumping of the air. If soil<br />

blocks the probe tip perforation, soil vapor cannot be withdrawn and the apparatus will record either no<br />

reading or a distorted value not representing the real contaminant concentration. High under-pressure<br />

during the measurement may also indicate a blocked probe.<br />

Wait a while before measuring in order to stabilize the soil gas conditions within the hole. This time<br />

interval must be equal for all stations of the locality and depends on the soil texture. For very<br />

permeable soils this time interval may be short (30 seconds, for example). For semi-permeable soils<br />

and in windy weather when the hole is strongly aired, the time interval needs to be considerably longer<br />

(for example 2 minutes).<br />

• Measure the fi<strong>rs</strong>t station: While Measuring Mode of the locality is displayed on the instrument screen<br />

(Window W.10.2), press “RUN” button for measuring the fi<strong>rs</strong>t station X = 0, Y = 0. The RUN button is<br />

used to start measuring the station with the displayed coordinates, for measuring the fi<strong>rs</strong>t station, or for<br />

re-measuring a station that has already been surveyed.<br />

The measuring cycle starts with a resetting period.<br />

27<br />

ABC Inc: 10.0<br />

X: 0.0 Y: 0.0<br />

O 2 : --.- % T: --.-<br />

P:<br />

PID 118<br />

---ppm<br />

Meth<br />

---ppm<br />

T.P.<br />

---ppm<br />

CO 2<br />

---ppm<br />

W. 10.2 – Measuring Mode.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!