MEASURING – STANDARD GRID<br />
• Make a hole at the fi<strong>rs</strong>t station of the new locality using a brace or a<br />
similar field tool (never use the sampling probe).<br />
• Pull out the brace and with minimum delay insert the probe vertically<br />
straight down. Do not rotate the probe while inserting it into the hole as<br />
rotation may let soil into the probe tip perforation and prevent air from<br />
entering into the probe.<br />
• Make sure that the hole is quickly and perfectly sealed with the probe<br />
sealing cone which can be moved up or down.<br />
• After inserting the probe into the hole, ensure that soil vapor can be withdrawn from the sampling<br />
probe by trying to suck air from the probe outlet. The probe must allow easy pumping of the air. If soil<br />
blocks the probe tip perforation, soil vapor cannot be withdrawn and the apparatus will record either no<br />
reading or a distorted value not representing the real contaminant concentration. High under-pressure<br />
during the measurement may also indicate a blocked probe.<br />
Wait a while before measuring in order to stabilize the soil gas conditions within the hole. This time<br />
interval must be equal for all stations of the locality and depends on the soil texture. For very<br />
permeable soils this time interval may be short (30 seconds, for example). For semi-permeable soils<br />
and in windy weather when the hole is strongly aired, the time interval needs to be considerably longer<br />
(for example 2 minutes).<br />
• Measure the fi<strong>rs</strong>t station: While Measuring Mode of the locality is displayed on the instrument screen<br />
(Window W.10.2), press “RUN” button for measuring the fi<strong>rs</strong>t station X = 0, Y = 0. The RUN button is<br />
used to start measuring the station with the displayed coordinates, for measuring the fi<strong>rs</strong>t station, or for<br />
re-measuring a station that has already been surveyed.<br />
The measuring cycle starts with a resetting period.<br />
27<br />
ABC Inc: 10.0<br />
X: 0.0 Y: 0.0<br />
O 2 : --.- % T: --.-<br />
P:<br />
PID 118<br />
---ppm<br />
Meth<br />
---ppm<br />
T.P.<br />
---ppm<br />
CO 2<br />
---ppm<br />
W. 10.2 – Measuring Mode.