27.11.2012 Views

sin αst

sin αst

sin αst

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONCEPTUALISATION<br />

most suitable solution for the present purpose. The lift-based version is chosen due its<br />

superior performance and its applicability for production of electricity.<br />

32<br />

4.5 Principal solution<br />

The principal solution is a horizontal-axis wind turbine containing the subsystems shown<br />

on figure 4.17.<br />

R<br />

o<br />

t<br />

o<br />

r<br />

Hub<br />

Figure 4.17: Major components of the principal solution<br />

The following paragraphs contain a brief description of each subsystem. It also identifies<br />

the associated focal points, limitations and exclusions of the development phases that<br />

follow the present conceptual phase. These are in accordance with the prioritisations of<br />

EWB and the available project resources.<br />

Control<br />

Drive train Generator<br />

Yaw system<br />

T<br />

o<br />

w<br />

e<br />

r<br />

Foundation<br />

Nacelle<br />

Electrical<br />

system

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!