Public Works programmes 30%10.1.1.9. POPULATION BENEFITTINGDirectlyTotal number of projects aimed at Water Internal Bulk 275072 UnknownTotal number of projects aimed at Water Regional Bulk 0 0Total number of projects aimed at Water Reticulation 29850 UnknownTotal number of projects aimed at Water Treatment Works 93949 68696Total number of projects aimed at Internal Sanitation 5000 UnknownTotal number of projects aimed at Sanitation Bulk 0 2980Total number of projects aimed at Strategic Planning 0 010.1.1.10. PREPARATION & MAINTENANCEIs there an Operation & Maintenance Plan in place?10.1.1.10.1. WATER SERVICES INFRASTRUCTURE:Existing Groundwater InfrastructureIndirectlyYESZ - Zero <strong>Co</strong>mpliance1 - Below minimum requirement2 - Minimum basic requirement3 - Above minimum requirementExisting Surface water Infrastructure N/R Not RequiredStaff to perform the function 1 Staff to perform the function 1Budget to perform the function 1 Budget to perform the function 1Sufficient for:Sufficient for:RDP Z RDP ZHigher level services: Z Higher level services: Zthe Growth & Development Strategy of the WSA: Z the Growth & Development Strategy of the WSA: ZExisting Water Treatment Works InfrastructureExisting Pump Station InfrastructureStaff to perform the function 1 Staff to perform the function 1Budget to perform the function 1 Budget to perform the function 1Sufficient for:Sufficient for:RDP Z RDP ZHigher level services: Z Higher level services: Zthe Growth & Development Strategy of the WSA: Z the Growth & Development Strategy of the WSA: ZExisting Bulk Pipeline InfrastructureExisting Tower & Reservoir InfrastructureStaff to perform the function 1 Staff to perform the function 1Budget to perform the function 1 Budget to perform the function 1Sufficient for:Sufficient for:RDP Z RDP ZHigher level services: Z Higher level services: Zthe Growth & Development Strategy of the WSA: Z the Growth & Development Strategy of the WSA: Z10.1.1.10.2. FINANCIAL VIABILITY, INCOME, METERING & BILLINGResidential: WaterIndustrial: WaterURBAN RURAL URBAN RURALUnits Supplied NA NA Units Supplied NA NAMetered % NA NA Metered % NA NABilled % 59% 59% Billed % NA NANot Metered NA NA Not Metered NA NAIncome Received % NA NA Income Received NA NANKLM Integrated Development Plan <strong>20</strong>12_<strong>20</strong>13 55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!