12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ghatak Stone QuarryGeneral DetailsAddressContact PersonBangpa Stone Quarry, Ura, BumthangDorji WangchukTypes of minerals mined Construction material (Quartzite)Stripping Ratio 0.66:1Operation <strong>and</strong> Annual Throughout the year, 20,000MTProductionGeological/Residual Reserve 413,400 MT<strong>and</strong> projected year to lastLease Area <strong>and</strong> Period 12.28 hectares, (September 2006-2016)Observation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentQuarrying had not followed the FMFS <strong>Report</strong> adequately.There were no benches.There were traces of material extraction by undercutting ofrocks.Currently initiatives are being taken to extract the materialfrom the top. However, the blast materials from the top arerolled down <strong>and</strong> collected from the bottom instead ofconstructing approach road, developing benches <strong>and</strong>transporting the material from the top.The management has not given due importance tooccupational safety <strong>and</strong> health aspects. People were allowedto work without even wearing helmets.No first aid kit was seen.The management had not provided disposal facilities <strong>for</strong>sanitary waste.Top soils were not stored separately.No check dam was seenOverburden <strong>and</strong> inter-burdens were not dumped at theapproved dump site. There<strong>for</strong>e, poor overburdenmanagement was observed. However, the proprietorreported that the waste materials were being lifted bycontractors <strong>for</strong> road filling works.There is good vegetation around the quarry.106

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!