Compliance Monitoring Report for Mines and Quarries - National ...
Compliance Monitoring Report for Mines and Quarries - National ...
Compliance Monitoring Report for Mines and Quarries - National ...
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Overburden/Interburden& OthermaterialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentWater EnvironmentNoise EnvironmentBiological Environment5. Approach/AccessRoad ConditionsWater Drainage System6. Environment <strong>and</strong>Progressive RestorationRestorationEnvironmental Bondthe pre-determined site. A check dam was underconstruction to arrest the waste materials.The Pit slope was in-between 55 to 70 0 <strong>and</strong> bench heightabout 20meters from the base.The management has not carried out monitoring of air,water <strong>and</strong> noise at the mining site.The mine has been in operation <strong>for</strong> about 14 years <strong>and</strong>there was no vegetative cover at the mining area.The management has not carried out af<strong>for</strong>estationprogram.Approach road to the mine area was about 6 km whichtakes-off from 28 km point from Phuentsholing-Thimphuhighway. The access road is pitched with side <strong>and</strong> crossdrain to channel the surface water.The restoration of the mine was primary focused on theconstruction of check dam.Environmental bond deposit Nu.15,45,840.007. Others The management has employed 55 workers.The undersize/rejects materials generation was about 20 to30%.Gumboot was supplied to the regular staff only.Channeling of mine water was not developed.1.10 RecommendationThe Pit slope of the mining area <strong>and</strong> waste disposal site is in-between 55 to 70 0 . Themanagement has to operate the mine <strong>and</strong> dispose the waste in such a way, that it is easier toattend the final pit slope of 45 0 .The height of the waste disposal site maintained very high without proper benching. Themanagement has to decrease the height with proper benching.37