12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Gidaphug Marble MineGeneral DetailsAddressContact PersonBhutan Marble & Minerals Pvt. LtdGidakom, ThimphuMr. D.B. GurungGeneral ManagerMarbleType of mineral minedStripping RatioOperation <strong>and</strong> Annual Throughout the year <strong>and</strong> 80,000 MTProductionGeological/Residual Reserve<strong>and</strong> projected year to lastLease Area <strong>and</strong> Period 21.6 hectares, 1/04/2008 to 31/3/2013Observation1. Mining Operation DesignPit Slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentDevelopment works was carried top-down <strong>and</strong> pit slopevaries in-between 50 to 80 o .Bench heights were in-between 8 to 12 meters.Bench widths were kept between 6 to 19 meters.The management has provided the workers with protectivegears such as helmets breathing masks, earmuffs <strong>and</strong>safety boots.Drinking water <strong>and</strong> first-aid-kit were available at themining site.Toilet facilities were not provided.The management has not provided disposal facilitates <strong>for</strong>sanitary waste.Top soil was not store separately.Overburden was loaded, hauled <strong>and</strong> disposed in anidentified waste dump-yard.The overburden inclusive of undersize <strong>and</strong> rejects weredisposed-off at the pre-determine site.Check dam made out of gabion wall was already filled-up.Over burden is spilled over, thereby affecting theapproach road to mine.The management has to expedite the construction of newcheck dam as planned in-order to prevent or avoid damageto approach road <strong>and</strong> vegetation below the existing wastedumpyard.The height <strong>and</strong> top width of the overburden weremeasured at 67.4 meters <strong>and</strong> 71 meters respectively.The management has not carried out monitoring of air,water <strong>and</strong> noise at the mining site.73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!