12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

quantity of waste materials (overburden <strong>and</strong> other waste). Most of these wastes are washeddownhill during heavy monsoonIn most of these mines, because of the geological <strong>for</strong>mation, maintenance of final Pit slopeof 45 0 , <strong>and</strong> bench height <strong>and</strong> width of 5 meters <strong>and</strong> 2.5 meters each is not possibleGenerally the mines are leased <strong>for</strong> a maximum period of three years. The environmentalrestoration bond collected is based on reserve, which is predetermined <strong>and</strong> not on the basisof actual mineral deposit <strong>and</strong> environmental damage/degradation caused. The amountcollected may be less since mineable reserve estimated is comparatively small compared tothat of captive minesThe majority of the mines are located at the foothill of Sukrety <strong>and</strong> Kharipakha underSamtse, which may affect the settlements lying at the top of the mines. Some miningoperation have been carried out in private l<strong>and</strong>, which have been bought by the proponentsSamtse Dzongkhag has constructed a farm road to connect the resettlement areas <strong>and</strong> othervillages. The take-off point of the road is from Sukrety <strong>and</strong> passes below the Talc mines inKharipakha area. There is a potential risk to the road if the mine is not managed properly<strong>and</strong> restoredSpecific findings <strong>for</strong> coal minesIn case of Rishore coal mines, the demarcation pillars 4, 5, 6 <strong>and</strong> 7 are just next to the crest of theultimate pit slope maintained at a gradient of 70º, which is too steep <strong>and</strong> may cause instability ofthe area. The pillars (4,5,6 <strong>and</strong> 7) located above need to be shifted further by 30 to 80 meteres <strong>for</strong><strong>for</strong>mation of benches <strong>and</strong> to stabilize the slope. The crest of the top bench at piller No. 5 wasobserved to be a thin ridge. On the other side, it was found to be sloping downwards falling in theprivate l<strong>and</strong> which is being acquired by the company. Once acquired, benches can be developed bythe company from top down <strong>and</strong> the steep dead end can be reduced in height by atleast 15 meters<strong>and</strong> the slope made more gentle.Rishore Mine No. 5 was abondoned. Though the ultimate pit slope was maintained at a steeperangle, it was observed that there was no sign of instability. The scope of further advancement to<strong>for</strong>m proper benches <strong>and</strong> reduce the slope to restore the mine was restricted by private l<strong>and</strong>situated just above it. The management has built a check dam to arrest the overburden rolling downthe hill. However, there were two rows of benches maintained at the top of the mine followed by anumber of benches along the lateral side of the mined area.There are 34 registered households <strong>and</strong> about 28 thram holders in the village located on thenorthern side of the mine. Out of the above mention registered households, 15 of them are close tothe mine area. However, no immediate threat to the settlement above is observed.6. RecommendationsThe recommendations are further segregated into immediate, medium <strong>and</strong> long-term approach tocarry out environmentally sound mining operation.8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!