12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Dipujhora Talc MineThe environmental clearance was issued by DGM since the competency rest with them <strong>for</strong> arealess than three (03) hectares.General DetailsAddressContact PersonDipujhora Talc MinePhuntsho Duter Yangphel Tshogley ChirtshogSamtseTel. No. 17601086PhuntshoPromoterTalc lumpsType on mineral minedStripping Ratio (Ore to Waste) 1:8Number of working days <strong>and</strong> Seasonal (180 days) <strong>and</strong> estimated annual production 1,000 MTAnnual ProductionGeological/Mineable Reserve Estimated Geological reserve 3,400 MT <strong>and</strong> minable reserve3,000 MTLeased Area <strong>and</strong> Period 1.52 hectares (11/10/06-10/10/2009; 3Yrs)Observation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> Protective GearsWater, Toilet <strong>and</strong> First AidKit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilOverburden/Inter-burden,Undersize/Rejects/OthermaterialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length of WidthDevelopment work was carried out from top–down <strong>and</strong>pit slope varies in-between 50 to 65 0 .Bench heights were maintained between 3 to 19meters.Some bench widths were maintained between 5 to14meters whereas others are missing.The management has provided the workers withprotective gears which were limited to helmets only.Drinking water, first-aid-kit <strong>and</strong> bathroom facilitieswere not available at the mining site.The management has not provided disposal facilitates<strong>for</strong> sanitary waste.Top soil was not stored separately but it was disposedalong with the overburden.The overburden generation was very high. Overburdenwas disposed downhill in an identified waste dumpyardin the pit plan.Check dam made out of gabion wall was constructed atthe base of the dump-yard.Pit slope was between 55 to 60 0 <strong>and</strong> there was nobenching. The height of the overburden dumped wasabout 15 meters.64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!