12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TW Stone QuarryThis quarry is being operated based on the environmental clearance issued by the DGM.General DetailsAddressContact PersonType of minerals minedStripping RatioOperation <strong>and</strong> AnnualProductionGeological/Residual Reserve<strong>and</strong> projected year to lastLease Area <strong>and</strong> PeriodObservation1. Mining Operation DesignPit slope AngleBench Height <strong>and</strong> Width2. Occupational Health <strong>and</strong>SafetySafety <strong>and</strong> ProtectiveGearsWater <strong>and</strong> SanitationFacilitiesFirst-Aid-Kit3. Waste <strong>and</strong> OverburdenManagementSanitary WasteTopsoilUndersize/reject,Overburden/inter-burden<strong>and</strong> Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentWater EnvironmentTW Stone QuarryDawakhaGup TsheringSlabs & boulders3.29 acres (1.29 acres in the East <strong>and</strong> 2 acres in the West)Operation of the quarry has not followed the FMFS <strong>Report</strong>adequately. Hence the quarry phases were seen almostvertical.Other that helmets, the management not provided any otherpersonal protective gears.Sanitation <strong>and</strong> water supply facilities were not provided atthe quarry.The supervisor present during the monitoring reported thatfirst aid kit was available at the site office but it could not beverified since the office was locked <strong>and</strong> the proprietor wasaway.The management has not provided disposal facilities <strong>for</strong>sanitary wastes.Top soil is not stored separately.Overburden <strong>and</strong> inter-burden were not dumped properly;some overburdens were dumped in the open quarry area.The height of overburden dumped at the approved dump sitewas 30 meters.Overburdens dumped in the quarry was about 8 meters, 7.5meters, <strong>and</strong> 48.9 meters in width, height <strong>and</strong> lengthrespectively which is about 2,934 m 3 .One check dam of dry wall measuring 2m x 0.7m x 9.4mwas constructed at the overburden dump site.The management has not carried out monitoring of air,water <strong>and</strong> noise at the quarry site.The periphery of the quarry has good vegetation.93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!