12.07.2015 Views

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

Compliance Monitoring Report for Mines and Quarries - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TopsoilUndersize/Rejects,Overburden/Interburden&Other materialsMechanism of Dumping<strong>and</strong> ArrestingPit slope Angle, BenchHeight <strong>and</strong> Length ofWidth4. Environmental AspectsAir EnvironmentWater EnvironmentNoise EnvironmentBiological Environment5. Approach/AccessRoad ConditionsWater Drainage System6. Environment <strong>and</strong>Progressive RestorationRestorationEnvironmental Bondstoring the top soil. Some of the top soil generated wasused to level the road.Overburden generation was minimal <strong>and</strong> consisted mostlyof undersize materials.Waste material was loaded on the truck <strong>and</strong> disposed atthe pre-determined site. The disposal site was located justabove the road. A retaining wall was constructed to arrestthe waste materials.Pit slope was in-between 50 to 60 0 <strong>and</strong> bench height about10 meters from the base.The management has not carried out monitoring of air,water <strong>and</strong> noise at the mining site.The mine has been in operation <strong>for</strong> about 3 years <strong>and</strong> therewas no vegetative cover at the mining site.The management has not carried out any af<strong>for</strong>estationprogram.Approach road to the mine area is about 5 km which takesoff from 22 km of Pasakha - Manitar roads. The accessroad was pitched with side <strong>and</strong> cross drain to channel thesurface water. The drain needs further improvements.The restoration of the mine was primary focused on theconstruction of check dam.Environmental bond deposit Nu. 13,50,000.007. Others The undersize material generation was about 10% of thetotal production. Some of the undersize materialsgenerated were used on the road <strong>and</strong> rests were disposedoff as water material.Worker employed were about of 60.Safety boot was made available only to the regular staff.Channeling of mine water was not developed <strong>and</strong> therewas no electricity at the base office.1.9 RecommendationThe height of the waste disposed was kept high. The management has to reduce <strong>and</strong>maintain as specified in the FMFS <strong>and</strong> EMP.The retaining wall constructed along the approach road which also serves as the check dam<strong>for</strong> arresting the waste has to be lengthened <strong>and</strong> also construct additional check dam justabove the retaining wall.The management has to continue to apply control blasting technique <strong>and</strong> break manuallywhich has not only helped in reduction of undersize but also noise level.35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!